Measure it. Value it. Certify it.

Bills of Quantities, tenders, variations and payment certificates for QS firms and contractors. From the first drawing to the last certificate, in one place.

The problem

Spreadsheets run most contracts. That is the problem.

A contract is hundreds of BoQ lines, a dozen variations and a certificate every month, kept in files that never agree with each other. Here is what that costs firms, and what HodariQ does instead.

Both sides

The same BoQ retyped for every tender, quantities scaled off paper with a ruler, every valuation remeasured from scratch.

Import the BoQ once and measure on the PDF drawing. Tenders, the contract and every valuation work from that one bill, and measurements carry over from month to month.

Both sides

Variations lost in WhatsApp chats, certificates added up by hand at midnight, arguments over what was claimed and what was certified.

Every instruction becomes a numbered VO with its approvals. Retention, advance, VAT and WHT are worked out the same way on every certificate, the claim and the certified figure side by side.

Owners and contractors

Late payments and expired bonds noticed too late, no idea if the job makes money, and nobody can say who changed a figure.

Overdue certificates and expiring bonds go on someone's to-do list, site costs run against the budget, and every change is kept with a name and a date.

The BoQ is just the start.

Everything a QS needs to take a contract from tender to the last certificate: measure, compare, vary, value, certify and get paid, in one platform.

Bills of Quantities

Bills, sections, PC and provisional sums, measured items and % additions. Import a messy Excel BoQ in minutes.

→
Bill No. 2 & 3TZS
2/AExcavate foundation trenches · 150 m32,250,000
2/CConcrete grade 25 in foundations · 40 m315,200,000
3/A200 mm sandcrete block walling · 900 m241,400,000
3/CRoofing sheets on timber trusses · 400 m215,200,000
3/DAluminium windows 1200 x 1200 · 20 No9,000,000
Contract sum129,875,000
  • Import from Excel
  • Rate library
  • Revisions compared
  • Print for tender

Tender analysis

Every tender re-added, odd rates flagged, ranked. The winner's rates become the contract.

→
1Alpha Builders126.84M
2Bora Construction132.71M! 1 error
3Chui Contractors116.73M* 2 to check

Payment certificates

Interim, advance and final certificates, worked out and printed on your letterhead.

→

Interim certificate No. 4

TZS 48.2M

Kinondoni office block · Certified

ReviewPrint

Approvals in steps

By amount, by document. The contractor's QS claims, the employer's QS certifies.

→
  1. ✓Valuation preparedAsha J. · 09:24
  2. ✓Senior QS approvedPeter K. · 11:02
  3. Employer's QS certifyingAwaiting

Variation orders

Omissions and additions, star rates, approvals, and a register the employer can read.

→
VO-007Extra boundary wall+8.4M• Approved
VO-008Omit external paving-2.1M• Submitted

Measure from drawings

Take-off on PDF drawings: rooms, walls, doors and windows in a few clicks. Quick measure for rooms and foundations, and revised drawings turned into a variation order.

→
  • Bedroom 1, floor—
  • Bedroom 1, perimeter—
  • Doors D01–D03—
  • Windows W01–W02—

Bonds & insurance

Performance bonds, advance guarantees and policies, with a warning before they expire.

→

Performance bond expires in 21 days

How it works

From drawing to the last certificate.

Seven steps on one record. Each starts from what the last one left, so nothing is typed twice.

  1. 1

    Measure

    Take-off from drawings or quick measure rooms and foundations.

  2. 2

    Price

    Rates from your own price list, with wastage and profit.

  3. 3

    Tender

    Compare every tenderer's rates and rank them.

  4. 4

    Award

    The winner's rates become the Contract BoQ.

  5. 5

    Vary

    Instructions become approved variation orders.

  6. 6

    Value

    Monthly valuations, claimed beside certified.

  7. 7

    Get paid

    Certificates, invoices and overdue alerts.

Site Portal

The site and the office, on one phone.

Site engineers request materials and send the daily report from their phones; the office approves in a click. The reports become your evidence for variations and extensions of time.

  1. 01

    Requested from site

    Picked from your price list, with photos. No price is ever shown on site.

  2. 02

    Approved at the office

    Approve, reduce or reject with a reason; the site sees it at once, with a message.

  3. 03

    Delivered, into the costs

    The site confirms what arrived; it becomes a cost against the budget.

Inbox and Work

Every e-mail has an owner and a deadline.

Connect the firm's mailbox and each e-mail becomes work on its contract: checked, given to someone, replied to from HodariQ and marked done. Nothing waits in a shared inbox that nobody owns.

  1. 01

    E-mail comes in

    Newsletters go to Not work by themselves. Each real e-mail gets its summary, its contract and the deadline it asks for.

  2. 02

    Approve

    The Senior QS gives it to someone with a deadline. They are told at once, in HodariQ and by e-mail. Office › Team shows who is free.

  3. 03

    Reply and done

    Replies leave from the firm's mailbox; the answer comes back to the same line. Late work is flagged every morning.

No AI
Sorted for free
Same thread
Replies and answers
07:00
Each person's work
+ NewInboxTo check
FromSubjectStatus
Jenga Builders LtdInterim valuation No. 4 for certificationTo check
Arch. Neema M.Revised door schedule, Block BTo check
Mikocheni DevelopersCost report before the board meetingTo check
TANROADS Dar es SalaamClarification on BoQ item 4.2To check
ApproveReplyTo checkOpenDone

Interim valuation No. 4 for certification

Read from the e-mail: "within 7 days"

From
Jenga Builders Ltd
Who does it
Asha J.
Contract
KIN/2026/014
Deadline
19/11/2026

Both sides of the table

Two QSs. One version of the truth.

On every contract one QS claims and the other certifies. HodariQ works for both, so the figures you argue about are the same figures.

Consultant QS

Certifies

Measure, value, certify.

  • Prepares BoQs, tender reports and certificates
  • Checks every quantity the contractor claims
  • Approves variations and extensions of time
  • Certifies on the firm's letterhead

Contractor's QS

Claims

Claim, track, get paid.

  • Prepares applications for payment
  • Measures every quantity it claims
  • Tracks the site's real cost against budget
  • Pays subcontractors, with WHT handled

Interim certificate No. 4 · same record, both sides

Claimed

52.4M

→

Certified

48.2M

Every reduction shown line by line, with the reason.

Control

Every figure has a name and a date on it.

When a certificate is questioned months later, the answer is already there: who measured it, who approved it, and when it was locked.

Approval levels

By document and by amount. A large variation needs a second signature before it counts.

Roles

QS, Senior QS, Accounts and Directors each see and do only what their job needs.

Change log

Every quantity, rate and figure changed is kept with who changed it, when, and from what.

Locked records

A Contract BoQ or a certified certificate is frozen. Changes go through variations.

Pricing

A plan for every firm.

Priced by the contracts you run and the people who use it. Prices in US dollars, excluding VAT.

Starter

Up to 3 running contracts · 2 users

For a small firm running its first contracts on HodariQ.

Includes

  • Contracts, BoQs and Excel import and export
  • Variation orders, extensions of time and liquidated damages
  • Interim, advance and final certificates with retention, VAT and WHT
  • Invoices and payments received
  • Change log, alerts and dashboard
Book a Demo→

Professional

Most chosen

Up to 15 running contracts · 10 users

For consultants and contractors running several contracts at once. Every feature of HodariQ.

Everything in Starter, plus

  • Take-off on PDF drawings: scale read from the drawing, every room's floor and perimeter in one click, doors and windows counted, straight into the BoQ
  • Revised drawings compared, and the changes turned into a variation order
  • Queries to the architect, zones for floors and blocks, and heights from sections
  • Quick Measure for rooms, walls and foundations
  • Measurement sheets: times, dimensions and deductions behind every quantity
  • Tender analysis: re-added, odd rates flagged, ranked and awarded
  • BoQ revisions compared, with what changed and what it costs
Book a Demo→

Enterprise

Unlimited contracts and users

For firms that want HodariQ on a server of their own, or a licence that never runs out.

Everything in Professional, plus

  • No limit on running contracts or users
  • Installed on your own server, in your office or in the cloud
  • One-time licence: pay once and keep using HodariQ, with no monthly or yearly renewal
  • Several firms or branches in one installation, each with its own figures
Talk to Us→

All plans begin with a guided demonstration, on site or online, and include same-day support. Setup is included at no charge with annual billing.

Questions

What firms ask us first.

No. Firms that use them keep measuring there and import the BoQ from Excel. Firms that don't can prepare the BoQ in HodariQ, measure rooms and foundations with Quick Measure, or take quantities off PDF drawings exported from CAD.

See what HodariQ can dofor your firm.

  • ✓30-minute demo
  • ✓Set up in 1 day
  • ✓No card required