Your Excel works.Until it doesn’t.

Spreadsheets hold the figures, not the contract. Other tools measure the drawings and stop there. HodariQ runs the whole job and keeps every shilling adding up.

What changesfor your firm

Eleven parts of a QS practice, before and after. Every line below is something the system does today.

One system, start to finish

Drawings, BoQ, tenders, variations, valuations and certificates on one contract. Every figure is typed once and carried to the next step.

Figures that add up, every time

Retention, advance recovery, VAT, withholding tax and damages worked out the same way on every certificate. Previous payments are never retyped.

Variations that are never forgotten

Each instruction becomes a numbered VO with its approvals. Revised drawings are priced at contract rates and the revised sum stays current.

Valuations in hours, not days

Measurements carry over from last month, so only the change is measured. What was claimed and what was certified sit side by side.

Take-off that feeds the bill

Measure on the PDF drawing and send each quantity to its BoQ item. Your existing Excel BoQs come in as they are.

Tenders checked before they are awarded

Every tender is re-added, odd rates are flagged and bidders ranked. The winner's rates become the contract without retyping.

Rates and prices you build once

A rate library with build-ups of materials, labour and plant, and prices by region, ready for every new job.

Control for the owner of the firm

One dashboard for what is certified, unpaid and expiring. Approvals by amount, and a log of who changed what.

Built for the contractor too

Site costs against a budget from your own build-ups. Subcontractors certified and paid, certificates turned into invoices.

Made for here

TZS, VAT, withholding tax and the local procurement forms, set by choosing the country. Support the same day.

Easy to start

Works in any browser, nothing to install. Several people work at once, and you start in a day from your Excel BoQs.