How bids work
The six stages of a bid, the board, what each button does and who may press it.
A firm lives on the tenders it wins. Office › Bids keeps every tender the firm may bid for in one place: who leads it, when it closes, which documents are still missing, and, once the result is known, why it was won or lost. Over a year this is the firm's own record of what it wins and why it loses.
The stages
| Stage | What it means | How a bid gets there |
|---|---|---|
| Found | A tender we may bid for; nobody has decided yet. | New in Bids, or the NeST scout. |
| Assessed | We decided to bid. | Bid (Senior QS / Manager). |
| Preparing | The bid is being put together: documents, price, forms. | Start preparing. |
| Submitted | Handed in; waiting for the result. | Submitted (the day is kept). |
| Won | Awarded to us. | Won (Senior QS / Manager). |
| Lost | Not awarded to us, cancelled, or we chose not to bid. | Lost with its reason, or No bid (Senior QS / Manager). |
Reopen (Senior QS / Manager) takes a Won or Lost bid back to Submitted (or Assessed when it was never submitted), for a result recorded by mistake or a tender advertised again. A bid that is no use any more can be archived (Action › Archive); the filter Archived shows it again.
The board
Bids open as a board with one column per stage. A card shows the tender, the procuring entity, the tender no., when it closes (orange within 7 days, red when the date has passed), how many documents are not ready, our price and who leads it; NeST on a card means the scout found it. Drag a card to move it to another stage; the same rules apply as with the buttons (only a Senior QS / Manager moves a bid to Won or Lost, and Lost needs its reason). The list, the pivot and the graph (why bids were lost) are in the view switcher at the top right.
Filters: Live (not won or lost), I lead, To decide, From NeST, to decide, Closing within 7 days, Won, Lost. Group by Stage, Who leads it, Procuring entity, Why lost or Closing (month).
A bid's fields
| Field | Meaning |
|---|---|
| Tender | What is tendered, as the tender notice says it. |
| Tender no. | The number of the procuring entity or NeST. It becomes the contract no. if the bid is won. |
| Procuring entity | Who tenders it. It becomes the employer of the contract. |
| Region, Kind | Kind is Consultancy, Works or Other; a new bid takes Consultancy in a consultant firm and Works in a contractor (Settings › Our Firm › We act as). |
| Closes on | The closing date. Alerts and the document check use it. |
| Who leads it | The person putting the bid together (the person who added it). A bid from the scout has nobody until it is given. |
| Project value | The estimate published with the tender, when there is one. |
| Our price | Our tender sum (works) or our fee (consultancy). The list adds them up. |
| Bid or not, Why | The decision and its reason, with who decided and when. |
Who may do what
| Role | May do |
|---|---|
| Senior QS / Manager | Everything: Bid, No bid, Won, Lost, Reopen, Make contract, delete. |
| QS Officer | Add bids, lead them, fill them in, list the documents, Start preparing, Submitted. |
| Accounts, Director | Read only. |
Good to know
Bids and NeST scout is a feature of the Professional and Enterprise plans (Settings › Features › Bids and NeST scout).
Something unclear? Ask us on WhatsApp: we answer the same day.