The scale
How HodariQ reads and checks the scale of each page, how it turns clicks into metres, and setting it by hand.
Every figure of the take-off depends on the scale. HodariQ keeps one scale for each page of a drawing, reads it from the drawing when it can, and checks it against the dimensions the architect wrote, because a PDF is often not printed at the scale written on it.
How clicks become metres
A PDF measures its pages in its own units: 72 to the inch, so one unit is 0.3528 mm on paper. Your clicks are stored in those units whatever the zoom. A scale is two points and the real length between them; HodariQ divides the real length by the distance between the points to get the metres per unit, and the paper distance by the real length to get the ratio shown, such as 1:100.
A length is the sum of its straight pieces times the metres per unit. An area is worked out from its corners and multiplied by the metres per unit squared: at 1:100 one square unit is 0.03528 x 0.03528 = 0.001245 m2.
Read from the drawing
When a page opens without a scale, HodariQ reads two things from it:
- The written scale: 1:100 wherever it is written, in the title block or under a view. Ratios that are not scales, such as a mortar 1:4 or a concrete mix 1:2:4, are left out.
- The dimensions: every figure written along a dimension line (10,822 or 4500 in millimetres, 4.50 in metres), horizontal, vertical or slanted. The span between its ticks, arrows or extension lines gives one reading of the scale.
Readings that agree within 0.75% are grouped, and the biggest group wins (normally at least three dimensions). A dimension misread, for example one crossed by a grid line, does not agree with the others and is left out. The scale is the middle reading of the group, set on its longest dimension.
The scale pill
| The pill says | Colour | Meaning | Do |
|---|---|---|---|
| Scale 1:100 (read and confirmed) | Green | The dimensions agree with the written scale (within 1.5%). | Measure. |
| Scale 1:200 (from the dimensions) | Orange | The drawing says one scale, the dimensions show another: the PDF was printed bigger or smaller. The dimensions' scale is used, so measurements match the figures written on the drawing. | Measure; tell whoever printed it. |
| Scale 1:50 (from the dimensions) | Green | No scale is written, but the dimensions agree on one. | Measure. |
| Scale 1:100 (written, not checked) | Orange | A scale is written but no dimension could be measured. It is used as if the PDF were at its true paper size. | Measure one dimension you know before going on. |
| Scale 1:98.6 (set by hand) | Green | You set it with Scale. | Measure. |
| No scale on this page | Red | Nothing could be read: a scanned page, or text turned into lines. | Set it with Scale. |
When some dimensions agree on another scale, the message adds: Some dimensions are at another scale (1:20): check measurements in that part. That is usually a detail drawn on the same sheet.
Set the scale by hand
- 1Press Scale.
- 2Click both ends of a dimension you know (Snap puts the clicks on the ticks).
- 3Type its real length in metres and press Enter. A comma is read as the decimal point, so 3,66 and 3.66 are the same.
Choose the longest dimension you trust, an overall dimension rather than a short one: an error of one click is a smaller share of a long length. The two points must be apart and the length above zero. While Scale is on, the line the scale was set on is drawn on the page.
When the scale changes
- A scale you set by hand is kept when the page opens again; only Read Scale replaces it.
- Changing the scale of a page works out every measurement on it again, and the rows already sent to the measurement sheets follow at once.
- A page has one scale. A detail at 1:20 on a 1:100 plan cannot have its own: measure it on a second drawing made from the same PDF with that scale set, or type those quantities.
- Without a scale a length or an area shows No scale in the table and cannot be sent. Counts never need one.
Good to know
The Scales tab of the drawing's form lists each page's real length and metres per unit, for the record.
Something unclear? Ask us on WhatsApp: we answer the same day.