HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor firm

Bills of Quantities

  • Build a BoQ
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Take-off

Rooms: one click or every room

Floor area and perimeter inside the walls with one click, or every named room of a plan at once, with its finishes.

On a CAD plan HodariQ can find a room by itself: the space closed by its walls, measured on the inside face. Room does one room where you click; All Rooms does every room whose name is written in it. Both need the page's scale.

Room: one click

  1. 1Press Room.
  2. 2Click inside the room, not on a line.
  3. 3Two measurements are added: the floor (an area) and the perimeter (a length), named after the room when its name is written in it, e.g. BEDROOM 1 - floor and BEDROOM 1 - perimeter. Its outline is drawn: check it.
  4. 4Click the next room, or press Done (Esc).

How the room is found

  • HodariQ draws the plan's straight lines into a picture, at three dots for each drawing unit, leaving out dimension lines and their ticks, dashed lines (grids, hidden lines), curves (door swings) and lines shorter than 80 mm on site (hatching, symbols).
  • A gap in a wall line up to 3.5 m wide, a door or a window, is closed across, so the room stays shut at its openings.
  • The space around your click is filled out to the walls, its outline is traced, and its corners are put onto the wall corners next to them.
  • Area and perimeter are then worked out from that outline at the page's scale. A room may be up to 400 m2.

If the walls leave an opening wider than 3.5 m, or you clicked outside the building, HodariQ says so and measures nothing: measure that space with Area, clicking its corners.

All Rooms: the room schedule

  1. 1Press All Rooms. Every room name written inside the building is found, and the room around it is measured.
  2. 2Each room is outlined on the drawing and listed: Floor m2, Perim. m and Walls m2.
  3. 3Type Height floor to ceiling (m) (it starts at 3): the walls are the perimeter times it.
  4. 4Choose the Floor finishes and Wall finishes assemblies. The ones with Room in their name are chosen first; No assembly adds the measurements alone.
  5. 5Untick any room you do not want, then press Add ticked rooms.

For each ticked room HodariQ adds its floor (an area) and its walls (the perimeter as a length with the height), each with its assembly's items under it, ready for their BoQ items.

ExampleA bedroom 3.6 x 3.0 m inside, 3 m high, with the supplied room assemblies
Floor10.800 m2
Floor screed, floor tiles, ceiling (A)10.800 m2 each
Skirting (L, the perimeter)13.200 m
Walls: 13.2 x 339.600 m2
Internal wall plaster, paint (L x H)39.600 m2 each

What All Rooms leaves to you

  • Only names inside the building count (within the dimension lines round it), so the title block and the notes are never rooms. Words such as UP, DN, FFL, NORTH or SECTION, and door or window marks, are not room names.
  • Here only lines drawn as the two faces of a wall (70 to 450 mm apart) bound a room, so furniture round a name does not make a room.
  • Stairs, balconies, verandas, terraces and porches are always listed under Not measured (use Room or Area), as are rooms that could not be closed and spaces under 1 m2.
  • Doors are not taken off the skirting or the wall finishes: add the openings with Doors & Windows, and deduct the door widths from the skirting yourself.

Tip

Look at every outline before adding: a room whose wall is drawn as one thin line, or one opening onto a corridor, can come out larger than the room.

← PreviousLengths, areas and countsNext →Roofs and wall centre lines

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • Room: one click
  • How the room is found
  • All Rooms: the room schedule
  • What All Rooms leaves to you