HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor firm

Bills of Quantities

  • Build a BoQ
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Take-off

The screen, keyboard and tablet

What each part of the take-off screen does, the keys that speed it up, and measuring on a tablet.

The take-off fills the screen: the drawing on the left, the panel of measurements on the right, and two rows of buttons above them.

The top row

PartWhat it does
Arrow, name, DetailsBack; the drawing's form. Under the name: into the BoQ or VO it measures into.
Page 1 / 3 and the arrowsChanges page. Each page has its own scale; HodariQ reads it the first time the page opens.
Minus, plus, the percentage, the four arrowsZoom out and in by 25%, from 25% to 600%; the four arrows fit the whole page in the window. A drawing bigger than the window opens fitted; a small one opens at 100%.
The scale pillThe scale of this page and how it was found (see The scale). Hover over it for the full message.
The zone boxThe zone new measurements go into, or + New zone....
Read ScaleReads the scale from the drawing again and, when it finds one, replaces the scale of the page, even one set by hand.
PanelHides or shows the panel of measurements: more room for the drawing.
New RevisionUploads the architect's revised drawing and carries the measurements over.
Print, Dimension SheetsThe marked drawing and the take-off on dimension paper. Shown once something is measured.

The tools

The second row, in groups: Scale; Length, Area, Count; Dimension, Measure Height, Height List, Room, All Rooms; Doors & Windows, Same Symbols, Check Dimensions; and at the far right the question-mark icon (raise a query) and the speech-bubbles icon (the list of queries, with the number still open). Length, Area, Dimension, Room and All Rooms need the page's scale first; Count, Scale, the queries, Same Symbols and Measure Height do not.

While a tool is on, a bar under the buttons says what to click next, counts the points, and holds Undo point, Finish (Enter) and Cancel (Esc). Snap, the switch at the foot of the drawing, is always in reach.

The panel

A tool's findings come first (the rooms found, the door marks, the symbols, the dimension checks, the heights, the queries), then Measurements: one row each, numbered and coloured as on the drawing. The colours repeat after ten measurements and are the same on the printed drawing.

Keyboard

KeyWhileDoes
EnterLength, Area, CountFinishes the measurement (the same as Finish (Enter)).
EnterScale, after the two clicksSets the scale with the length typed.
EnterA query, after the two cornersRaises the query with the question typed.
EscAny toolCancels it; nothing is saved.
BackspaceLength, Area, Count, ScaleTakes the last point off (Undo point).
Shift, held while clickingLength, Area, ScaleThe new point goes straight across or straight down from the last one, whichever is nearer.
Enter, EscTyping a new zoneAdds it, or gives up.
EnterThe New drawing windowStart take-off once everything is filled.

Good to know

The keys do nothing while you are typing in a box (a description, a height): click the drawing first.

On a tablet

  • Two fingers zoom: the drawing stretches at once under your fingers, the point between them stays there, and it is drawn sharp again when you lift them.
  • One finger scrolls the drawing; a tap is a click.
  • There is no Shift key: switch Straight on in the bar while measuring a Length or an Area for straight lines.
  • There is no Backspace: use Undo point.
  • Panel hides the measurements for more drawing. Held upright, the panel goes under the drawing instead of beside it.
  • On a touch screen the buttons, boxes and rows are made bigger, for a finger.

Tip

Zoom in before clicking corners on a tablet: a finger covers more of the drawing than a mouse pointer, and Snap catches a corner only when the tap lands within a few pixels of it.

← PreviousStart a take-offNext →The scale

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • The top row
  • The tools
  • The panel
  • Keyboard
  • On a tablet