Chats and photos
The chats of the site: one group chat per contract, a chat on each request and report, unread counts, what reaches the site and what stays in the office, and how photos are made smaller.
The site talks to the office in Chats, as in a chat app on the phone. Each contract has one group chat for everything that is not about one request or report (no water today, the architect is coming tomorrow). Every material request and every daily report also has its own chat, so the question, the answer and the photos stay with the record they are about.
On the phone
- The chat button: a round button at the bottom right of the home page. A gold bubble on it shows how many messages from the office or the site team are not read yet, on every contract of the person.
- The chat list: tap the button. The contract's group chat, Site team and office, is always at the top. Under it, every request and daily report that has messages, the newest first. Each row shows the last message, its time (14:05 today, Yesterday, else the date) and its unread count.
- A chat: the whole screen. The office's messages are on the left in white, with the name of who wrote them; the person's own are on the right in maroon. Messages are grouped by day (Today, Yesterday, then the date). The input bar stays at the bottom: the camera button adds photos, the round button sends.
- From a request or a report: Chat with the office opens its chat, with the number of messages and the unread count. The top bar of that chat has a button back to the request or report.
- 1Tap the chat button, then the chat (or Chat with the office on a request or report).
- 2Type the message, add photos with the camera button, or both. The photos show as small pictures above the input bar before sending.
- 3Tap send. The message shows at once on the right, with its time.
An empty message is refused: write a message or add a photo. A chat opens at its last message and marks what is on it as read, so the bubble on the chat button goes down. While a chat is open on the screen, the phone checks every 15 seconds for new messages and shows them by itself. It does not reload while something is being typed or a photo is picked, so nothing is lost. A chat cannot be opened on a contract that is not the person's: the page is not found.
At the office
- The group chat: Site › Chats lists one chat per contract, newest message first, with the site team of the contract. Open it and answer with Send message. A contract's chat is made the first time someone opens the chats of that contract; every Senior QS / Manager of the firm follows it from then and is notified of new messages in HodariQ.
- A request or a report: the chat is the conversation at the bottom of the request or report, as on any other HodariQ record. Answer with Send message.
- Photos sent from the site are on the message itself, so the office sees them in the conversation, with the message they belong to.
Who follows each chat
| Chat | Followers (notified of new messages) |
|---|---|
| Group chat of a contract | Every Senior QS / Manager of the firm. Office people can follow it too, with Follow. |
| Material request | The site person who asked, and the people who approve material requests (see Who approves). |
| Daily report | The person who wrote it, and every Senior QS / Manager of the firm. |
Everyone on the site team of a contract sees its group chat and the chats of its requests and reports. A site person with an E-mail on their person record also gets the office's messages by e-mail.
What reaches the site, and what does not
The site pages show messages only. Internal notes and status changes stay in the office.
| At the office | Seen on the phone |
|---|---|
| Send message on the request or report | Yes |
| Log note | No, never |
| Approved as requested. | Yes, written by HodariQ on approval |
| Approved, with changes: Cement 50 kg: 150 of 200 bag. | Yes, item by item |
| Rejected: and the reason typed | Yes |
| Requested from site by, Approved by ...: it now needs a second approval, Delivery confirmed by ... Short: ..., Put into the costs of ... | No: notes for the office |
Tip
Use Log note for anything the site should not read, such as a supplier's price. Use Send message for the answer the site is waiting for.
Photos
Photos can be added to a request, to a delivery, to a report and to any message. A phone photo is often 4 to 8 MB; on a weak network that would take minutes. So each photo is made smaller twice.
| Step | What happens |
|---|---|
| On the phone, when picked | Made smaller to 1600 pixels on its longest side and saved as JPEG (quality 80), before it is sent. Kept as it was if that would not be smaller. |
| At HodariQ, when received | Fitted within 1920 x 1920 pixels and stored as a .jpg (quality 82), whatever the phone sent. |
| Limits | Up to 10 photos per send, each up to 15 MB as it left the phone. A file that is not a photo is refused: it is not a photo we can read. |
A 1600-pixel photo is still clear enough to read a delivery note or see the bars in a slab, and is usually a few hundred kilobytes. Photos picked one after another add up, to 10 at most, and their thumbnails show before sending.
Where the office sees the photos
- On the request: the Photos part (sent with the request) and the Delivery part (the delivery note).
- On the report: the Photos part. The cards of Site › Daily Reports show the first photo of each report.
- On a certificate: Site photos opens the reports and photos of its period.
Good to know
A photo from the site opens only for the site team of that contract and for the office. Another firm, or a site person of another contract, cannot open it even with its link.
Something unclear? Ask us on WhatsApp: we answer the same day.