HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor firm

Bills of Quantities

  • Build a BoQ
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Take-off

Revised drawings

Compare Rev B with Rev A, carry every measurement over, re-check only what changed.

When the architect sends a revised drawing, you do not measure it again. HodariQ compares it with the drawing it replaces, line by line, carries every measurement over, and marks only those the change touched.

Upload the revision

  1. 1In the take-off press New Revision (top bar), or New Revision on the drawing's form.
  2. 2Choose the revised PDF and type the Revision (e.g. Rev B).
  3. 3Press Compare and carry over. The new revision opens, with the card Rev B replaces A-101 Ground floor plan at the top of the panel.

The old drawing stays, read only, with the notice Replaced by Rev B: its measurements are now on the revision. Revisions are made from the newest one, so Rev C is made from Rev B.

How the drawings are compared

  • Lined up first: words written once on both drawings (grid marks, room names, unchanged dimensions) give the scale and the shift between them, so a revision printed on another paper size, or moved on the sheet, still compares. Without enough of them, the page sizes are used.
  • Every line of each drawing is then followed in small steps: a stretch with no line of the other drawing on it is a change. Changes shorter than about 1 mm on paper are ignored. Words are compared too: 2,360 becoming 2,460 is a change.
  • Changes close together are grouped into clouds, as a drafter clouds a revision. Show the changes draws removed lines red and added lines green, with the clouds.
  • The pages compared are page 1 and every page with a scale or a measurement. A page missing from the revision leaves all its measurements To check.

What each measurement becomes

StatusWhenDo
UnchangedNo change within reach of it (3 drawing units, or 100 mm on site), and its quantity is the same within 0.05%.Nothing.
Measured againA room whose drawing changed: HodariQ found the same room on the old drawing, then found it again on the new one.Check its outline.
To checkA change touches it, or its figure moved (a scale that changed).Measure again, Again with Room (areas) or Keep as is.
CheckedYou measured it again or kept it.Nothing.

The card counts each status. Measure again starts the measurement's own tool with Measuring again and its name on the bar; the new points replace the old, and its BoQ item, assembly, zone and height stay. A changed measurement shows was and its old quantity.

What is carried over

  • Each page's scale, moved onto the revision and checked against the revision's own dimensions: a note says when they show another scale.
  • Every measurement and its assembly items, with their BoQ items, times, heights, zones, pitch and centre-line settings.
  • The drawing's zone of new measurements.
  • The queries, at the same place, with their numbers (see Queries to the architect).

While the BoQ is being prepared

When the BoQ is still in Draft or Tender, the rows on the measurement sheets move to the revision at once: the BoQ follows the new drawing without counting anything twice. A measurement To check keeps its old points, and so its old quantity, until you measure it again.

When the BoQ is the Contract BoQ, the revision is turned into a variation order instead: see Revision to a variation order.

Good to know

Both drawings must be CAD PDFs: a scanned page cannot be compared line by line, and the revision is refused rather than carrying measurements as unchanged without comparing them. A drawing measured into a variation order cannot be revised: measure the revision on a new drawing. New Revision is shown to QS staff.

← PreviousCheck a take-offNext →Revision to a variation order

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • Upload the revision
  • How the drawings are compared
  • What each measurement becomes
  • What is carried over
  • While the BoQ is being prepared