Cost control
Contractor firms: a budget made from the BoQ build-ups, the costs to date, profit to date and the forecast final cost.
A contractor needs to know, for each job, what it was expected to cost, what it has cost so far and what it has earned. HodariQ keeps the three side by side per contract and per cost head, and warns when the money is going out faster than the work is certified.
Where it is
Open the contract and press Details: the Cost Control tab is there once the contract has started. It needs a contractor firm and the Cost Control and Subcontracts feature (Settings › Features, Professional plan), and it is shown only to Senior QS / Managers, Accounts and Directors. The menu Money › Costs & Subcontracts holds the costs, subcontracts and subcontractor certificates of all contracts.
Make a quick budget from the BoQ
- 1On the Cost Control tab press Quick budget from BoQ (Senior QS / Manager), or, for a budget item by item, Budget line by line (see Budget line by line). It asks to confirm: budget lines made from the BoQ before are replaced; lines you added yourself stay.
- 2HodariQ reads the Contract BoQ, less approved omissions and plus approved additions, and writes one budget line per cost head, marked From the BoQ.
- 3Add any line it cannot know (site office, insurance...) in the list below: Cost head, Description, Budget.
| BoQ item | Goes into the budget as |
|---|---|
| An item with a rate build-up (its own build-up for costing, or the library rate it was priced from) | Quantity x the build-up's materials, labour, plant, subcontract and overheads, each in its head. Profit is not a cost. |
| A measured item without a build-up | Its amount less the Expected margin (Settings › Cost Control, 15%), in Other costs |
| A preliminaries item without a build-up | Its amount less the expected margin, in Site overheads and preliminaries |
| A PC Sum | Its full amount in Subcontractors: it is paid to the nominated subcontractor |
| A Provisional Sum | Its full amount in Other costs: it is spent in full |
| Contingency | Left out: not a cost |
The figures
| Figure | Worked out as |
|---|---|
| Earned (certified) | Gross valuation to date of the last certified certificate |
| Cost to date | The costs entered, plus the subcontractor certificates approved (gross to date of the last approved one of each subcontract) |
| Profit to date | Earned less cost to date (red when negative) |
| Margin to date % | Profit to date / earned |
| Budgeted cost | The sum of the budget lines |
| Profit expected (budget) | Revised contract sum less budgeted cost |
| Forecast final cost | Cost to date + budgeted cost x (1 - share of the work certified) |
| Forecast profit | Revised contract sum less forecast final cost (red when negative) |
Costs ahead of work
The table on the tab shows each head's Budget, Spent to date, Remaining and Budget spent. When more of the budget is spent than the share of the work certified, plus 5 points, the head's % turns red, and when it happens for the whole job a red banner says More of the budget is spent (...%) than the share of the work certified (...%). In the example, a crane hire of 9,000,000 takes the spending to 28.8% of the budget for 13.0% of the work: the banner shows.
The dashboard shows Profit to date per contract to those who may see costs (in red when costs run ahead), and the dashboard of one contract shows its cost table.
Good to know
The budget is a planning figure; it posts nothing to the accounts. The schedule of materials uses the same items and build-ups, so its materials, labour and plant add up to the budget's (see Schedule of materials).
Committed (LPOs)
What is ordered on issued LPOs and not delivered yet is committed: the money is promised but not spent. Cost Control shows Committed (LPOs) next to the cost to date, and the cost report adds a column Committed, LPOs by cost head. Remaining is then the budget less what is spent less what is committed, so a head that is fully ordered shows nothing left even before the materials arrive. LPOs on the tab lists the contract's LPOs. The profit and forecast figures count what is spent only.