HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor firm

Bills of Quantities

  • Build a BoQ
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Money

Cost plans

The elemental estimate before there is a BoQ: priced per m2, by quantity or as a lump sum, issued to the client, then checked against the BoQ.

Before there is a Bill of Quantities, the client asks what the building will cost. A cost plan prices it element by element (substructure, frame, roof...), adds preliminaries, contingency and VAT, and gives the cost per m2 of floor area. It stands on its own: no contract is needed. Once the project becomes a contract, the plan can be checked against the Contract BoQ.

Make a cost plan

  1. 1Go to Estimating › Cost Plans and press New.
  2. 2Type the Project, and choose the Client. Fill Location, Building type, Stage (Concept / feasibility, Scheme design or Detailed design), Date, Gross floor area (m2) and Storeys.
  3. 3On Elements, the usual 18 elements are already listed, each priced per m2 of floor area: Substructure, Frame, Upper floors, Roof, Stairs, External walls, Windows and external doors, Internal walls and partitions, Internal doors, Wall, Floor and Ceiling finishes, Fittings and furnishings, Sanitary appliances and plumbing, Electrical installations, Mechanical installations, Fire protection, External works and drainage.
  4. 4For each element choose how it is Priced and type the Rate; delete the elements the building does not have, add others, and add a Description of what is allowed for.
  5. 5Check Preliminaries (10%), Contingency (5%) and VAT (the firm's rate) under the elements, and write the Assumptions (prices at today's rates, exclusions such as land, fees and furniture).
  6. 6Press Print Cost Plan, then Issue to Client.

How it is worked out

PricedAmount
Per m2 of floor areaGross floor area x rate. The quantity follows the floor area when it changes.
Quantity x rateThe element quantity typed, with its unit, x rate. It stays when the floor area changes.
Lump sumThe rate is the sum.
  • Building works = the sum of the elements. Each element shows its Per m2 GFA and its % of works.
  • Preliminaries = % of the building works; contingency = % of building works plus preliminaries.
  • Total (excl. VAT) = works + preliminaries + contingency; VAT = % of that total; Cost per m2 = total excl. VAT / gross floor area.
ExampleOffice block, 1,000 m2
Substructure 60,000 a m2 x 1,00060,000,000
Frame 90,000 a m2 x 1,00090,000,000
External works 500 m2 x 40,00020,000,000
Building works170,000,000
Preliminaries 10%17,000,000
Contingency 5% of 187,000,0009,350,000
Total (excl. VAT)196,350,000
VAT 18%35,343,000
Cost per m2196,350
Total (incl. VAT)231,693,000

If the floor area grows to 1,200 m2, the substructure becomes 72,000,000 while the external works stay 20,000,000.

Issue, change, copy

  • Issue to Client needs a priced plan (a total above 0). An issued plan is locked; to change it press Back to Draft, or copy it for a new estimate: the copy is a draft with a new reference and all the elements.
  • Each plan has its own reference, CP-year-three digits.
  • The print-out shows the project, client, location, building type, design stage, floor area and storeys, the elements with quantity, rate, amount and per m2, the estimated cost excluding and including VAT, the assumptions and exclusions, and Prepared by (Quantity Surveyor). A plan not yet issued is marked DRAFT.

Cost Check against the BoQ

On the Cost Check tab pick the Contract (this can be done even on an issued plan). Its Contract BoQ total appears beside the plan total with BoQ less plan (red when the BoQ is above the plan). Then, on a draft plan, match each element to the bills of the BoQ that price it: each element shows its BoQ amount and the difference, so you see where the BoQ is above the plan. The plan total includes preliminaries and contingency; the BoQ total includes its own.

Good to know

Cost plans come with the Cost Plans feature (Settings › Features, Professional plan). QS Officers and Senior QS / Managers make and issue them; Directors read them.

← PreviousSubcontractor certificatesNext →Add your site team

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • Make a cost plan
  • How it is worked out
  • Issue, change, copy
  • Cost Check against the BoQ