The daily report from the phone
Weather, people by trade, work done, problems, instructions and photos: sent in two minutes, correctable until the next day.
The daily site report is the contract's diary. It is written on site, on the day, by the person who saw it. At the office it becomes evidence for variation orders, extensions of time and certificates (see Daily reports at the office).
Write the report
- 1On the home page tap Daily report. Two tabs at the top: Today and Yesterday.
- 2Weather: tap Sunny, Cloudy, Rain or Heavy rain (Sunny until changed). Type the Hours lost to weather, from 0 to 24.
- 3People on site: each trade and how many. The first rows are Mason and Labourer; Add a trade adds more. Trades offered: Mason, Carpenter, Steel fixer, Labourer, Electrician, Plumber, Painter, Welder, Machine operator, Other; any other name can be typed.
- 4Work done today: the only part that must be written, for example Cast ground floor slab, grid A to C.
- 5Plant and equipment, Problems and delays, Visitors and instructions: optional, but write them whenever there is something. A problem or an instruction not written here is hard to prove later.
- 6Photos: from the camera or the gallery.
- 7Tap Send report. The page shows Report sent. and the report opens.
A row of people with no number is left out. The total of people is worked out and shown on the report, the home page and the office list.
One report a day, per person
Each person sends one report per contract and day. Two engineers on the same contract can each send their own. Sending again for the same day does not make a second report: it updates the one already sent.
- A report is for today or yesterday only: the phone offers no other day, and an older day cannot be started from site.
- The home page button shows Sent today once the person's report for today is in.
- The other people of the contract can read every report, but only its author can correct it.
Correct a report
Its author sees Correct this report on the day and the day after. Tapping it opens the form with everything already filled in and the words sent, you are correcting it; the button reads Save changes.
| Report of | Can be corrected on | From then on |
|---|---|---|
| Monday | Monday and Tuesday | Read-only from Wednesday |
| Saturday | Saturday and Sunday | Read-only from Monday |
- A correction replaces the weather, the hours, the people and the texts with what is on the form.
- Photos are only added: new photos join the ones sent before, and none can be removed from the phone.
- After the edit window the report is fixed for good. The office reads it but cannot change what the site wrote: a report stays the site's own record.
What makes a good report
- Instructions with who gave them: Architect asked to move the kitchen window. The first line of the instructions becomes the title of a variation order made from the report.
- Problems with times: No water from 10:00 to 13:00. This is the detail an extension of time needs.
- Hours lost on every rainy day, even a few: added up, they make the case for exceptional weather.
- A photo of the work done: the office uses them on the certificate of the month.
Tip
Missed yesterday? Open the Yesterday tab and send it today. After that the day stays empty, and the office gets an alert for it.
Something unclear? Ask us on WhatsApp: we answer the same day.