HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor firm

Bills of Quantities

  • Build a BoQ
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Site Portal

Add your site team

Give site engineers, foremen and storekeepers a login for their phone, send it on WhatsApp, and switch it off when they leave.

The people on site get their own small set of phone pages: the Site Portal. With it they ask the office for materials, confirm what was delivered and send the daily site report. They see only the contracts you give them, and never a price, a budget or a certificate. This page is the office side: who gets a login, how it is made and how it is switched off.

Before you start

  • The plan: the Site Portal is part of the Professional and Enterprise plans. Starter does not have it.
  • The switch: the administrator switches it on or off in Configuration › Settings, All settings, part Features, Site Portal. Switched off, the Site menu is hidden, the phone pages say Site Portal is off and nothing new can be sent. Nothing already entered is deleted.
  • Who adds people: only a Senior QS / Manager adds and changes the site team. The Site › Site Team menu is shown to them only; QS Officers, Accounts and Directors can read the team but not change it.
  • Which contracts: a site person can only be given contracts that are running or at practical completion.

Add a site person

  1. 1Go to Site › Site Team and press Add site person. From a contract, the same button is on its workspace, in the Site tab (shown while the contract is running or at practical completion).
  2. 2Type the Name and the Phone: their WhatsApp number, for example 0712 345 678. Pick the Role: Site engineer, Foreman, Storekeeper or Other. E-mail is optional.
  3. 3Pick the Contracts they work on. Opened from a contract's workspace, that contract is already filled in.
  4. 4Press Add and make the login. The same window now shows the Link, the Login and the Password, each with a copy button.
  5. 5Press Send on WhatsApp. WhatsApp opens with the message ready: a greeting with their name and your firm's name, the link, the login and the password. Press send.

Good to know

The password is shown only in this window. Closed without sending, it cannot be shown again: open the person and press Send login to make a new one.

How the login works

Behind each site person HodariQ makes a portal login: a login for people outside the office, with no menus and no access to the office screens. It opens the site pages only.

  • The login is the phone number as typed, without the spaces: 0712 345 678 signs in as 0712345678. On the person you can change Login to another number or to an e-mail address. A number needs at least 9 digits; an e-mail must be a valid address.
  • One login, one person: two site people cannot share a login. A login that an office user already has is refused, with the message to choose another login.
  • The password: 8 small letters and figures, without 0, O, 1 or l, so it is easy to read out and type on a phone.
  • The WhatsApp number: a Tanzanian number typed as 07... is sent to as 2557..., so it reaches the phone without changes.
  • The link carries the name of your firm's database: the phone lands on your sign-in page, not on another firm's.
  • Not counted by the plan: site logins are not users of your plan. Add as many as you need; Users under Your Plan › Usage does not change.
  • E-mail: when filled in, the office's messages on their requests and reports also reach them by e-mail.

Switch a login off or on

Untick Active, with the toggle in the list or on the person, and the login stops working at once. Tick it again to switch it back on: the same login and password work again. Changes to the name, login, phone or e-mail are carried to the login behind the person the same way.

  • Switched-off people stay in the list, greyed. The filters Active and Switched off separate them.
  • A switched-off person no longer counts as the site team of a contract when HodariQ looks for a missing daily report.
  • Send login is hidden while the person is switched off: tick Active first.

Delete or keep

A person who has never sent a request or a report can be deleted: their login is switched off with them. A person who has sent either is never deleted. HodariQ refuses and says to untick Active instead, so every request and report keeps the name of the person who sent it.

A forgotten password or a new phone

Open the person and press Send login. A new password is made, the old one stops working at once, and the window with Send on WhatsApp opens again with the new message. A person who still knows their password can change it themselves on the phone, under My account (see On site).

What the person form shows

On the formWhat it is
Requests and ReportsHow many material requests and daily reports they have sent. Press to open the list.
RoleSite engineer, Foreman, Storekeeper or Other. For your list only: every role can do the same things on the phone.
PhoneTheir WhatsApp number: the login is sent there.
LoginWhat they type to sign in: the phone number, or an e-mail.
ActiveUntick to switch the login off at once.
Last signed inWhen they last signed in.
ContractsThe only contracts they see. A contract that is closed leaves their phone by itself.
← PreviousCost plansNext →On site: the phone pages

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • Before you start
  • Add a site person
  • How the login works
  • Switch a login off or on
  • Delete or keep
  • A forgotten password or a new phone
  • What the person form shows