HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor firm

Bills of Quantities

  • Build a BoQ
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Take-off

Zones

Tag measurements by floor, block or house, and report each BoQ item's quantity zone by zone.

A zone is a part of the works: Ground floor, Block A, House 12. Each measurement can be in one zone, and the quantities of the contract are then reported zone by zone, in PDF and in Excel. The BoQ and the valuations are not split: a zone is a tag of the take-off, for programming, ordering and checking.

Measure into a zone

  1. 1In the zone box on the top bar choose the zone, or + New zone...: type its name (e.g. Ground floor) and press Enter (Esc gives up).
  2. 2Measure: every new measurement goes into that zone. The drawing remembers it, so a ground floor plan stays on Ground floor.
  3. 3To move one measurement, open its settings and choose another Zone. Its assembly items always move with it.

Zones belong to the contract: a zone made on one drawing is offered on every drawing of the contract. A name already used (in any capitals) is not made twice. No zone leaves new measurements untagged.

What a zone changes

  • The row on the measurement sheet carries it: A-101 Ground floor plan, p.1 [Ground floor]: External walls. Moving a measurement to another zone renames its row at once.
  • The dimension sheets show it before the description.
  • A zone cannot be deleted while measurements are in it.
  • A revised drawing keeps the zone of the drawing and of each measurement.

Quantities by zone

On the drawing's form (Details), Quantities by Zone prints, and Quantities by Zone (Excel) downloads, the quantities of the whole contract:

  • Every drawing of the contract, at its newest revision (a replaced drawing is never counted twice).
  • Every measurement whose BoQ item is chosen, whether sent yet or not; measurements without a BoQ item are left out.
  • Deductions taken off. A measurement without a zone goes in a No zone column.
  • In Excel: one row a BoQ item (ref, description, unit), one column a zone, and a Total that is a sum of the zone columns, so the sheet checks itself. The PDF lists each zone's items in turn.
ExampleBlock walling in two zones
Ground floor182.400 m2
First floor176.250 m2
No zone12.000 m2
Total370.650 m2

Tip

Choose the zone before you start a plan, not after: the zone box is on the top bar for that. Moving fifty measurements one by one afterwards is slow.

← PreviousHeights from sectionsNext →Send to the BoQ

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • Measure into a zone
  • What a zone changes
  • Quantities by zone