HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor firm

Bills of Quantities

  • Build a BoQ
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Bills of Quantities

Print the BoQ

The priced and the unpriced (tender) PDF: cover, bill pages with page totals, Collections and the Grand Summary.

HodariQ prints the BoQ the way East African QS firms bind it: a cover, the pages of each bill with a total at the foot of every page, a Collection after each bill and the Grand Summary at the end. Two versions come from the same BoQ.

Print

  • In the editor, Print prints the priced BoQ at once.
  • On Details, the Print button prints the priced BoQ too; the gear menu, under Print, offers Bills of Quantities (priced), Bills of Quantities (unpriced, for tender) and Measurement Sheets.
  • The file is named BoQ - (contract and BoQ name), or BoQ (unpriced) - ... for the tender copy.

Priced and unpriced

On the pagePricedUnpriced, for tender
Cover labelPRICEDUNPRICED: FOR TENDER
Contractor on the coverShown when knownLeft out
QuantitiesShownShown
Rates and amounts of itemsShownBlank, for the tenderer
Provisional Sums, PC Sums, ContingenciesShownShown: they are fixed by the QS
% additionsThe % and the amountBlank: the tenderer writes its own %
Page totals, Collection, Grand Summary figuresShownBlank

What each part holds

  • Cover: the firm's logo, name, address and registration number; BILLS OF QUANTITIES FOR THE (contract title); the site and region; the version label; then Employer, Architect / Engineer, Quantity Surveyor, Contractor, Contract No., Date and Revision.
  • Every page: the firm and the bill (Bill No. 2: Substructure) and the contract title at the top; the contract number, Page 2/3 and the BoQ name with its revision at the foot.
  • Bill pages: Item, Description, Unit, Qty, Rate, Amount TZS. Sections print in capitals and bold.
  • Collection: page 2/(last + 1) of the bill, then Total of Bill No. 2 carried to Grand Summary.
  • Grand Summary (page GS): each bill with its amount, Sub-total, Add VAT 18% (or VAT: exempt), Total carried to Form of Tender, and lines for the Signature of Tenderer, Date, Name and address and Witness.

Page totals: the setting

In Configuration › Settings › Certificates and printing, BoQ page totals chooses how a bill page is totalled. It applies to every BoQ of the firm.

ChoiceFoot of each pageThe Collection lists
Each page carried to the Collection (the default, usual in East Africa)Carried to Collection: the total of that page aloneEvery page of the bill (Page 2/1, Page 2/2...) with its total
Running total carried forwardCarried forward: the running total so far (the last page says Carried to Collection); the next page opens with Brought forwardEvery section of the bill with its total
ExampleBill 2 on two pages, page totals carried to the Collection
Page 2/1, carried to Collection3,622,500
Page 2/2, carried to Collection11,400,000
Total of Bill No. 2 carried to Grand Summary15,022,500

How pages are cut

A PDF cannot total its own pages, so HodariQ decides where each page ends before printing, and every page total is then exact. Pages are A4 portrait, Calibri 10 point, full grid. The height of each line is worked out from its description: about 46 characters to a printed line (36 for a section, in capitals), 4.3 mm per printed line plus the cell padding. Lines are added to a page until the next one would not fit in the 222 mm the page has for lines (8 mm less on running-total pages after the first, for the Brought forward row), then a new page starts. A section or heading is never left alone at the foot of a page: it moves to the next page with the line under it. The space left at the foot of a page is ruled down to the total line.

Tip

Keep each description to the words the item needs. A description written as one paragraph of 200 characters takes five printed lines; split notes that apply to several items into a heading above them.

Good to know

The print always shows the BoQ as it is now. A Contract BoQ prints its locked figures; a Superseded revision can still be printed for the file.

← PreviousPrice list, regions and the Price BookNext →Export to Excel

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • Print
  • Priced and unpriced
  • What each part holds
  • Page totals: the setting
  • How pages are cut