HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor firm

Bills of Quantities

  • Build a BoQ
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Bills of Quantities

Price list, regions and the Price Book

The prices of materials, labour and plant, by region, the starter library, price surveys and the HodariQ Price Book.

The Price List (Estimating › Rate Library › Price List) is where a build-up takes its unit costs: cement per bag, sand per m3, a fundi per day, a mixer per day. Each item is a resource of one type: Material, Labour, Plant or Subcontract.

The list

  • Pick a Type or a Category in the panel on the left to see its items. Categories can sit within others (Sand & aggregates / Sand); they are kept under Rate Library › Categories.
  • Columns: Type, Code (left empty, it is made from the type: M-001 for materials, L- labour, P- plant, S- subcontract), Category, name, Unit, Price, Price as of, Usual wastage % (proposed on every build-up line that uses it) and Rates (how many rates use it).
  • A price is shown grey when there is none yet, and yellow when it is more than 180 days old. The filters No price yet, Old price and With a HodariQ price find them.
  • Changing a price dates it today and adds a row to the item's Price history, with who changed it.

Start with the starter library

Press Load Starter Library and confirm. HodariQ adds 98 usual materials, labour and plant items in categories, and 22 typical build-ups for common items of work (excavation, concrete, walling, plaster...), all without prices: your prices are your own. Items you already have with the same HodariQ code are kept as they are, so the button can be pressed again safely. Every starter build-up carries the note to check its quantities against your own practice before pricing a tender with it.

Regions

Your own prices are for your home region, set under Configuration › Settings › All settings › Prices › Our prices are for (Dar es Salaam unless changed). For any other region, under Rate Library › Regions, each region has a Code (e.g. MWZ) and Price factors: how much dearer or cheaper it is than home, by Type and/or Category, e.g. Materials +8 (transport), Labour -10.

Price of an item in a regionComes from
Home region, or a rate with no regionThe item's Price (shown on its form as Our price (home region)).
Another region, the item has its own price thereThat price, typed in Prices in other regions on the item.
Another region, no own priceHome price x (1 + factor / 100), with the most precise factor that applies.

The most precise factor wins: a factor for a category beats one for its parent category, any category factor beats a factor for a whole type, and a type beats a factor for everything. Price used on the item's region table shows what a rate for that region takes.

ExampleCement in a region with Materials +8%
Home price19,000
Factor for Materials+8%
Price used in that region20,520

A rate set to a region is priced with that region's prices. To price a set of rates for a region, select them in Rates, open the gear menu, Rates for a Region, choose the region and press Make Regional Rates: each gets a copy coded with the region (e.g. CON-025-MWZ) priced with the region's prices. Running it again prices the copies again. The home region is refused: its rates are the ones with no region.

Price survey in Excel

  1. 1Press Price Survey (Excel) on the price list, or open Rate Library › Price Survey.
  2. 2Press Download: the price list with one row per item and one price column per region.
  3. 3Fill in the prices collected from suppliers (one unit, before VAT). Leave a cell empty to keep the price as it is.
  4. 4Choose the filled file and press Upload. Every changed price is dated today and kept in the price history. Codes not in the price list and cells that are not a price are listed and left as they were.

The HodariQ Price Book

  • HodariQ publishes reference prices from the market. They arrive in your price list as HodariQ price beside your own, for your home region and for the other regions, with their date. Configuration › Settings › All settings › Prices › HodariQ Price Book shows the date of the last one, or Not received yet.
  • Your own prices are never changed by it. Diff % shows your price against the HodariQ price: (yours - HodariQ) / HodariQ x 100, in red above +15% and green below -5%.
  • To take them, select the items and press Use HodariQ Prices: your home and regional prices become the HodariQ prices, dated with the Price Book's date.

Good to know

Whatever the source, a new price reaches a rate only when the rate is updated, and never a BoQ already priced. HodariQ prices are a guide: you stay responsible for the prices in your BoQs.

← PreviousRates and build-upsNext →Print the BoQ

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • The list
  • Start with the starter library
  • Regions
  • Price survey in Excel
  • The HodariQ Price Book