The change log
What HodariQ records when a quantity, rate or amount changes: who, which line, the old and the new value, and when.
Every change to the figures of a document is written in that document's history, under the document itself: who made it, which line, which field, the old value and the new value. The date and time are those of the note. The notes stay with the document, so its history answers "who changed this quantity, and when?" months later.
What is recorded
| Document | Changes recorded on its lines |
|---|---|
| BoQ | Bills added and removed, and changes of their bill no., title and order. Items added and removed; changes of type, ref., description, unit, quantity, rate, % of a % addition, the line it is added to, and the library rate. |
| Variation order | Lines added and removed; changes of omission or addition, BoQ item, how it is priced, library rate, ref., description, unit, quantity and rate. |
| Valuation | Changes of the way a line is valued (% complete or quantity to date), the % complete and the qty to date. |
| Materials on site | Lines added and removed; changes of the price list item, description, unit, quantity, value and % allowed. |
| Library rate | Changes of the build-up: resource, type, description, quantity per unit, unit cost and wastage. |
On the document itself the history also records each change of status (submitted, approved, certified, locked), each approval step given, and changes to its main terms.
How a note reads
One save gives one note per document and per person, in three parts: Lines added, Lines changed, Lines removed. Each line is named by its ref. and the start of its description, then each change as old → new.
- Long texts are cut after 60 characters with ….
- A note lists at most 40 lines per part, then "... and 12 more."
- The note is in the name of the person who saved, even when a button worked behind the scenes with wider rights.
What is not logged line by line
Work the system does in bulk is summarised once instead of hundreds of single notes: importing a BoQ from Excel, making a new revision, loading the lines of a new valuation from the contract. The document's history says what was done in one note.
Locked records
A locked Contract BoQ, an approved variation order and a certified certificate cannot be changed at all, so their figures can no longer move. Corrections are made the way a QS makes them: a variation order for the BoQ, the next valuation for a certificate. The change log then shows the correction on the new document.
Tip
To see the history, open the document and scroll to the notes under it.