HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor firm

Bills of Quantities

  • Build a BoQ
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Getting started

The change log

What HodariQ records when a quantity, rate or amount changes: who, which line, the old and the new value, and when.

Every change to the figures of a document is written in that document's history, under the document itself: who made it, which line, which field, the old value and the new value. The date and time are those of the note. The notes stay with the document, so its history answers "who changed this quantity, and when?" months later.

What is recorded

DocumentChanges recorded on its lines
BoQBills added and removed, and changes of their bill no., title and order. Items added and removed; changes of type, ref., description, unit, quantity, rate, % of a % addition, the line it is added to, and the library rate.
Variation orderLines added and removed; changes of omission or addition, BoQ item, how it is priced, library rate, ref., description, unit, quantity and rate.
ValuationChanges of the way a line is valued (% complete or quantity to date), the % complete and the qty to date.
Materials on siteLines added and removed; changes of the price list item, description, unit, quantity, value and % allowed.
Library rateChanges of the build-up: resource, type, description, quantity per unit, unit cost and wastage.

On the document itself the history also records each change of status (submitted, approved, certified, locked), each approval step given, and changes to its main terms.

How a note reads

One save gives one note per document and per person, in three parts: Lines added, Lines changed, Lines removed. Each line is named by its ref. and the start of its description, then each change as old → new.

ExampleA note on a BoQ after one save
Lines changed2/A Excavate trench for foundations: Quantity: 120 → 130
2/C Concrete grade 25 in strip footings: Rate: 280,000 → 295,000
Lines added2/F Hardcore filling under floor slab
  • Long texts are cut after 60 characters with ….
  • A note lists at most 40 lines per part, then "... and 12 more."
  • The note is in the name of the person who saved, even when a button worked behind the scenes with wider rights.

What is not logged line by line

Work the system does in bulk is summarised once instead of hundreds of single notes: importing a BoQ from Excel, making a new revision, loading the lines of a new valuation from the contract. The document's history says what was done in one note.

Locked records

A locked Contract BoQ, an approved variation order and a certified certificate cannot be changed at all, so their figures can no longer move. Corrections are made the way a QS makes them: a variation order for the BoQ, the next valuation for a certificate. The change log then shows the correction on the new document.

Tip

To see the history, open the document and scroll to the notes under it.

← PreviousSending documents: e-mail and WhatsAppNext →Plans and limits

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • What is recorded
  • How a note reads
  • What is not logged line by line
  • Locked records