HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor firm

Bills of Quantities

  • Build a BoQ
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Take-off

Heights from sections

Read a storey height off a section, check it against the levels written there, and let every wall that uses it follow.

Wall areas need heights, and the heights are on the sections. Measure Height reads the height between two levels on a section and keeps it, by name, for the whole contract. Every measurement that uses it follows when it is measured again.

Measure a height

  1. 1Open the section and press Measure Height.
  2. 2Click a point on each level: the floor, then the ceiling (or the wall plate).
  3. 3The bar shows Measured (at the page's scale) and, when level figures are written at both points, Levels written with the height between them. If the two differ by more than 20 mm it warns: They differ: check the scale or the levels.
  4. 4Type the name, e.g. Ground floor: floor to ceiling.
  5. 5Press Use 2.85 m (levels) or Use 2.851 m (measured). The height is saved and Height List opens.

How it is read

  • Measured: the vertical distance between your two clicks times the page's scale. Only the up-and-down distance counts, so the two clicks need not be one above the other.
  • Levels: a figure is taken as a level only when it says so, with a sign (+3.000, -0.450, ±0.000) or a level word (FFL, SFL, FGL, NGL, TOS, TOB, SSL, RL, LEVEL, LVL, W/P, CEILING, CLG, FL), so a dimension in metres is never read as a level.
  • The level of a click is the one written beside it, or at the end of the level line it is on. The height is the difference between the two.

Measured needs the page's scale; the levels do not, so a section without a scale can still give a height from its levels.

ExampleA ground floor on a section
Levels writtenFFL +0.150 and CLG +3.000
From the levels2.850 m
Measured at 1:502.851 m
Difference1 mm: no warning

Use a height

In a length's or an area's settings, Height from section lists the contract's heights (it appears once there is one). Choose one: x Height / depth takes its value. Typed goes back to a height of your own; typing a figure in x Height / depth also cuts the link.

The height list

Height List shows each height with its value, how it was found (Measured at the scale, From the levels written, or Typed), the drawing and page it was read on, what was read, and how many measurements use it.

  • Measure again: click the two levels again (on a revised section, say). Every measurement using it takes the new height, and their rows on the measurement sheets follow.
  • The bin deletes a height only when nothing uses it. Give those measurements another height first.

Good to know

Heights belong to the contract, not to one drawing: a height read on the sections is offered on every plan of the contract, and kept on a revised drawing. A count has no height: a door's height is its size, typed in its own settings.

← PreviousAssembliesNext →Zones

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • Measure a height
  • How it is read
  • Use a height
  • The height list