HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor firm

Bills of Quantities

  • Build a BoQ
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Bills of Quantities

Measurement sheets

The dimension rows behind a quantity, the squaring rule, and Quick Measure.

Behind any measured item, preliminaries or dayworks line you can keep its measurement sheet: the rows of dimensions that make its quantity, as on dimension paper. Once a line has rows, its quantity is the total of the rows, so every quantity can be traced back to the sizes it came from.

Open a sheet

  1. 1In the editor press Details, then on the Grand Summary tab press Open lines on the bill.
  2. 2On the line, press the calculator button (Measurements). It is there for measured items, preliminaries and dayworks.
  3. 3Add a row per location: Location / description (e.g. Grid A-B, ground floor), Times, No., Length, Width, Height / depth. Tick Deduct for an opening or anything taken off.
  4. 4Save the window: the total of the rows becomes the line's Quantity (shown in bold at the top of the window), and the amount and totals follow.

The squaring rule

Quantity of a row = Times x No. x Length x Width x Height, using only the dimensions you fill in. Leave Width and Height empty for a length, Height empty for an area. A ticked Deduct row counts as a minus. Each row is rounded to 3 decimals, and so is the total.

ExamplePlaster to walls, ground floor
Walls: 1 x 1 x 42.600 x 3.000127.800 m2
Deduct doors: 1 x 4 x 0.900 x 2.100(7.560) m2
Deduct windows: 1 x 6 x 1.200 x 1.200(8.640) m2
Quantity of the item111.600 m2
  • Dimensions can never be negative: tick Deduct instead.
  • Times is how many identical items (4 columns); No. is a further multiplier. Both start at 1.
  • The optional From drawing column shows the figure a take-off measurement brought in, when the row came from a drawing.

Where rows come from

  • Typed by hand, as above.
  • Quick Measure in the editor (below).
  • The take-off: a measurement sent from a drawing becomes a row of the item's sheet, and is changed, never added twice, when it is sent again (see Take-off › Send to the BoQ).

Quick Measure

  1. 1In the editor press Quick Measure.
  2. 2Choose what you measure: Room (floor, ceiling, walls, skirting), Wall (walling and plaster), Strip foundation, Floor slab, Columns or Beams. Type the Location / name (written on every row) and How many identical.
  3. 3Type the sizes in metres. For a room or a wall, give the doors and windows under Openings (deducted) (door 0.9 x 2.1 and window 1.2 x 1.2 are proposed).
  4. 4Press Calculate. Each quantity is listed with how it was measured and the BoQ item it goes to: HodariQ proposes an item with the same unit whose description holds the key word (floor, ceiling, plaster, skirting, concrete...). Choose another item, or none and a bill, to make a new item.
  5. 5Untick Add for a quantity you do not want, then press Add to the Measurement Sheets. Back returns to the sizes.
ExampleRoom 4.0 x 3.5 m, 2.7 m high, one door and one window, 2 identical
Floor finish: 2 x 4.0 x 3.528.000 m2
Ceiling: 2 x 4.0 x 3.528.000 m2
Walls: 2 x 15.0 (perimeter) x 2.7 = 81.000, less door 3.780 and window 2.88074.340 m2
Skirting: 2 x 15.0 = 30.000, less door widths 2 x 0.928.200 m

If the chosen item already had a quantity typed by hand and no sheet, that quantity is first kept as a row Quantity before measuring, so it is not lost when the sheet total takes over. For a strip foundation, the excavation, blinding, footing concrete, foundation walling, backfilling (the excavation less what stays in the trench) and disposal of the surplus are all worked out from the centre-line length, trench width and depth, blinding and footing thicknesses and the wall height. HodariQ refuses a blinding and footing deeper than the trench.

Locks and printing

  • Rows can be changed only while the BoQ is a Draft or Tender. On a Contract BoQ they are locked with the BoQ.
  • New Revision copies the rows with their lines. Copy from Another Project does not: the new building is measured again.
  • On Details, the gear menu, Print › Measurement Sheets prints every line that has rows: location, times, no., length, width, height, quantity, deductions in brackets, and the total.
  • Measurement sheets on valuation lines and how measured work is carried into the certificates are described under Valuations.

Good to know

A quantity typed in the grid over a line that has rows is replaced by the rows' total the next time a row of that sheet changes. Keep the quantity in the sheet once a line has one.

← PreviousUnitsNext →Import from Excel

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • Open a sheet
  • The squaring rule
  • Where rows come from
  • Quick Measure
  • Locks and printing