HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor firm

Bills of Quantities

  • Build a BoQ
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Bills of Quantities

Rates and build-ups

Library rates built up from materials, labour and plant, with wastage, overheads and profit, and how a BoQ line takes one.

The Rate Library (Estimating › Rate Library) holds the firm's rates for items of work. A rate can be typed as a figure, or built up from the price list: so much cement, sand and labour per m3, plus overheads and profit. A BoQ line picks a library rate and keeps its own copy of it.

Make a rate

  1. 1Go to Estimating › Rate Library › Rates and press New. Rates are listed by trade.
  2. 2Choose the Trade. Leave Code empty: it is made from the trade, e.g. CON-011 for the next Concrete rate (RAT-001... with no trade).
  3. 3Type the Description as it should appear in the BoQ, e.g. Concrete grade 25 (1:1.5:3) in columns, and choose the Unit.
  4. 4On the Build-up tab add a line per resource: choose the Resource from the price list; its type, unit, unit cost and usual wastage fill in. Type the Qty / unit: how much of it one unit of the rate takes (8 bags of cement for 1 m3). Change Wastage % if needed.
  5. 5Check Overheads % and Profit % (10 and 10 to start). The Rate per unit is worked out.
  6. 6For a rate with no build-up, type it in Rate (no build-up) instead.

The formula

  • Each build-up line: Qty / unit x Unit cost x (1 + Wastage % / 100).
  • Net cost: the build-up lines added up. Costs by type splits it into materials, labour, plant and subcontract.
  • Overheads: Net cost x Overheads %.
  • Profit: (Net cost + Overheads) x Profit %: profit is on cost and overheads together.
  • Rate: Net cost + Overheads + Profit, rounded once, at the end, to whole shillings.
ExampleConcrete grade 25 (1:1.5:3), per m3
Cement 8 bags x 19,000, wastage 5%159,600
Sand 0.45 m3 x 35,000, wastage 5%16,538
Aggregate 0.9 m3 x 50,000, wastage 5%47,250
Water 0.2 m3 x 2,000400
Fundi 0.5 day x 35,00017,500
Labourer 2 days x 18,00036,000
Mixer 0.1 day x 80,0008,000
Poker vibrator 0.1 day x 40,0004,000
Net cost (materials 223,788, labour 53,500, plant 12,000)289,288
Overheads 10% of 289,28828,928.80
Profit 10% of 318,216.8031,821.68
Rate per m3 (350,038.48 rounded)350,038

The overheads and profit boxes show whole shillings, so they can differ from the rate by a shilling when added by hand: the rate itself is rounded only once.

Who sees the build-up

The build-up, net cost, overheads and profit are seen only by users with the role Rate build-ups and margins. A Senior QS / Manager and a Director have it; the administrator can give it to a trusted QS Officer. Everyone else sees the rate only, and can still use it in a BoQ. QS staff can make and change rates; only a Senior QS / Manager can delete one.

History and changed prices

  • Every time a rate's value changes, the History tab gets a dated version with the rate, the net cost, who and why: First version, Changed by hand, or Prices updated from the price list. The Effective Date is the date of the current version.
  • A price changed in the price list never changes a rate by itself. The rate is marked Prices changed, a yellow box says the prices have changed since it was worked out, and the filter Prices changed lists all such rates.
  • Press Update from Price List on the rate, or select rates in the list and use Update from Price List in the gear menu, or press Update on the price list line of the resource. The new unit costs are copied in and a new version is recorded where the rate moves.
ExampleCement goes from 19,000 to 21,000 a bag
Rate before350,038
Cement line: 8 x 21,000 x 1.05176,400
New net cost306,088
Overheads 10%, profit 10% on cost and overheads64,278.48
Rate after Update from Price List370,366

Use a rate in a BoQ

  1. 1On the BoQ's Details, open the bill with Open lines.
  2. 2On the line, choose the rate in Library rate (the column says From library).
  3. 3The rate and the unit are copied into the line, and the rate's description too when the line has none. A section, heading or % line becomes a measured item.

The BoQ keeps its own copy: a later change in the library, or a price update, never alters a priced BoQ. Choose the rate again to take its new figure. On a variation order item the library rate is chosen the same way (see Variations).

Good to know

Rates, percentages and build-up quantities, costs and wastage cannot be negative. Archived rates are kept with their history but are no longer offered.

← PreviousPaste and copyNext →Price list, regions and the Price Book

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • Make a rate
  • The formula
  • Who sees the build-up
  • History and changed prices
  • Use a rate in a BoQ