Library rates built up from materials, labour and plant, with wastage, overheads and profit, and how a BoQ line takes one.
The Rate Library (Estimating › Rate Library) holds the firm's rates for items of work. A rate can be typed as a figure, or built up from the price list: so much cement, sand and labour per m3, plus overheads and profit. A BoQ line picks a library rate and keeps its own copy of it.
Make a rate
- 1Go to Estimating › Rate Library › Rates and press New. Rates are listed by trade.
- 2Choose the Trade. Leave Code empty: it is made from the trade, e.g. CON-011 for the next Concrete rate (RAT-001... with no trade).
- 3Type the Description as it should appear in the BoQ, e.g. Concrete grade 25 (1:1.5:3) in columns, and choose the Unit.
- 4On the Build-up tab add a line per resource: choose the Resource from the price list; its type, unit, unit cost and usual wastage fill in. Type the Qty / unit: how much of it one unit of the rate takes (8 bags of cement for 1 m3). Change Wastage % if needed.
- 5Check Overheads % and Profit % (10 and 10 to start). The Rate per unit is worked out.
- 6For a rate with no build-up, type it in Rate (no build-up) instead.
The formula
- Each build-up line: Qty / unit x Unit cost x (1 + Wastage % / 100).
- Net cost: the build-up lines added up. Costs by type splits it into materials, labour, plant and subcontract.
- Overheads: Net cost x Overheads %.
- Profit: (Net cost + Overheads) x Profit %: profit is on cost and overheads together.
- Rate: Net cost + Overheads + Profit, rounded once, at the end, to whole shillings.
The overheads and profit boxes show whole shillings, so they can differ from the rate by a shilling when added by hand: the rate itself is rounded only once.
Who sees the build-up
The build-up, net cost, overheads and profit are seen only by users with the role Rate build-ups and margins. A Senior QS / Manager and a Director have it; the administrator can give it to a trusted QS Officer. Everyone else sees the rate only, and can still use it in a BoQ. QS staff can make and change rates; only a Senior QS / Manager can delete one.
History and changed prices
- Every time a rate's value changes, the History tab gets a dated version with the rate, the net cost, who and why: First version, Changed by hand, or Prices updated from the price list. The Effective Date is the date of the current version.
- A price changed in the price list never changes a rate by itself. The rate is marked Prices changed, a yellow box says the prices have changed since it was worked out, and the filter Prices changed lists all such rates.
- Press Update from Price List on the rate, or select rates in the list and use Update from Price List in the gear menu, or press Update on the price list line of the resource. The new unit costs are copied in and a new version is recorded where the rate moves.
Use a rate in a BoQ
- 1On the BoQ's Details, open the bill with Open lines.
- 2On the line, choose the rate in Library rate (the column says From library).
- 3The rate and the unit are copied into the line, and the rate's description too when the line has none. A section, heading or % line becomes a measured item.
The BoQ keeps its own copy: a later change in the library, or a price update, never alters a priced BoQ. Choose the rate again to take its new figure. On a variation order item the library rate is chosen the same way (see Variations).
Good to know
Rates, percentages and build-up quantities, costs and wastage cannot be negative. Archived rates are kept with their history but are no longer offered.