HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor firm

Bills of Quantities

  • Build a BoQ
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Bills of Quantities

Lines, sums and totals

The nine kinds of line, how each is valued, and how bill, section and BoQ totals are worked out.

Every line of a bill has a Type. The type decides whether the line has an amount, how the amount is worked out, how it prints, and whether tenderers price it.

The kinds of line

TypeValued asUsed for
SectionNo amountA heading that starts a group of lines. The group gets its own total on the bill's Collection. Printed in capitals.
Heading / noteNo amountText only: a description that several items share, a preamble, a note.
Measured itemQuantity x rateThe usual measured work.
PreliminariesQuantity x rateItems of the preliminaries bill (site office, insurances, hoarding...).
DayworksQuantity x rateProvisional dayworks (labour hours, plant days).
Provisional Sum1 Sum x the sumA sum fixed by the QS for work not yet designed.
Prime Cost Sum1 Sum x the sumA sum fixed by the QS for a nominated supplier or subcontractor.
Contingency1 Sum x the sumThe contingency sum.
% addition% of another lineA percentage of a Prime Cost Sum, Provisional Sum or Dayworks line of the same bill, e.g. contractor's profit on a PC Sum.

Lump sums

A Provisional Sum, Prime Cost Sum or Contingency is entered as quantity 1, unit Sum, with the sum in Rate. In the line list of a bill on Details, choosing one of these types fills in quantity 1 and unit Sum for you. These three are fixed by the QS: they print on the unpriced tender copy too, tenderers do not price them, and the tender analysis copies them unchanged into every tender.

% additions

  • Put the % line just below the sum it is added to. It is linked to the nearest Prime Cost Sum, Provisional Sum or Dayworks line above it in the same bill.
  • Its description is filled in for you when empty: Add for contractor's profit (on a PC Sum or Provisional Sum) or Add for overheads and profit (on Dayworks).
  • In the editor you type the percentage in Qty / %; the Rate cell reads of the sum above.
  • A % line must be added to another line of the same bill, never to itself. A BoQ with a % line that has no % or no line to add it to cannot be locked.
  • When the sum changes, the % amount follows at once.

How the figures are worked out

FigureRule
Line amountQuantity x rate for measured items, preliminaries, dayworks and the three lump sums; sum x % / 100 for a % addition; nothing for sections and headings. Amounts and rates are kept in whole shillings; quantities to 3 decimals.
Section totalThe amounts of the lines from a section down to the next section. Lines above the first section are totalled under the bill's own title.
Bill totalEvery amount in the bill, % additions included. Carried to the Grand Summary.
BoQ totalThe bill totals added up: Total (excl. VAT). Once locked, this is the contract sum.
VATThe BoQ total x the VAT rate of the contract, rounded to whole shillings. VAT exempt contracts show VAT: exempt on print.
Priced linesHow many lines are of a priced type (shown on Details).
ExampleBill 2 Substructure and Bill 11 Provisional and PC Sums
2/A Excavate trenches, 120 m3 x 15,0001,800,000
2/B Hardcore filling, 40.5 m3 x 45,0001,822,500
2/C Concrete in strip footings, 30 m3 x 380,00011,400,000
Bill 2 total15,022,500
11/A Prime Cost Sum for lifts, 1 Sum40,000,000
11/B Add for contractor's profit, 5% of 40,000,0002,000,000
11/C Attendance on the lift installer, 1 Item x 500,000500,000
11/D Provisional Sum for external works, 1 Sum20,000,000
11/E Contingency, 1 Sum10,000,000
Bill 11 total72,500,000
Total (excl. VAT)87,522,500
VAT 18%15,754,050
Total (incl. VAT)103,276,550

Rounding happens once per figure: a line of 12.345 m3 at 350,038 is 4,321,219.11, kept as 4,321,219; the bill adds the kept amounts. Attendance is a measured item, not a lump sum, even when it is priced as one Item: tenderers price it.

The Collection and the Grand Summary

On Details, the Grand Summary tab lists each bill with its total, then Total (excl. VAT), VAT and Total (incl. VAT). Drag the handle of a bill to change the order of the bills. Open lines on a bill shows its lines as a list and its Collection tab: one row per section with its total, and the Total carried to Grand Summary.

Good to know

Quantities, rates and percentages are never negative. To take work out of a Contract BoQ, use a variation order: it shows what was omitted against each item.

← PreviousBuild a BoQNext →Units

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • The kinds of line
  • Lump sums
  • % additions
  • How the figures are worked out
  • The Collection and the Grand Summary