HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor firm

Bills of Quantities

  • Build a BoQ
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Variations

Pricing VO lines

Contract BoQ rates, library rates and star rates; omitting measured items and sums; % additions; the checks at Submit.

Every VO line is a quantity × a rate. Where the rate comes from decides what may be changed: an omission, or more of an existing item, keeps the contract rate; only new work gets a new rate. HodariQ checks these rules when the VO is submitted and again at every approval, so a VO that reaches the contract sum is always priced on the contract's terms.

How each line is priced

Priced fromUsed forThe rate
Contract BoQ rateEvery omission; more of an existing itemThe item's contract rate, locked. Submit refuses a different rate on a measured item: use a star rate to agree a new one.
Rate libraryAn addition priced from your rate library (on the Additions tab of Details, on plans with the rate library)Filled from the library rate, with its unit; can be changed.
Star rate (new, agreed)Work the Contract BoQ does not haveTyped: the rate agreed with the other side.

Every line's amount is quantity × rate. The VO's totals are: additions = sum of the added lines; omissions = sum of the omitted lines; net value = additions - omissions. Addition lines with no reference get one by themselves: VO-003/1, VO-003/2 and so on.

Measured items, sums and % additions

  • A measured item is omitted by quantity at its contract rate. The quantity omitted can never exceed what is left of the item: the quantity let, plus approved additions of the same item at its contract rate, less what other submitted or approved VOs already omit.
  • A Provisional Sum, PC Sum or Contingency is omitted by amount: its line has quantity 1 and you type the amount to take out in the Rate box (all of it, or the part used). It can never exceed what is left of the sum.
  • When a VO with the reason Design change omits a provisional or PC sum, HodariQ asks once whether the sum is being spent; if it is, choose Provisional sum expenditure. A VO made from a revised drawing gets that reason by itself when it spends a sum.
  • A % addition (profit, attendance on a PC sum) follows its item. If the VO changes an item that carries a % line, open Details and press Add the % Lines: the % lines come in as their own omissions or additions, worth the change of the item × the %. Submit refuses the VO until they are there.
  • On plans with measurement sheets, the calculator button on a line in Details opens its dimension rows; their total becomes the line's quantity. Quick Measure on the Added sheet measures new work from a few dimensions.

What Submit checks

At Submit, and again at every approval, HodariQ refuses the VO when: it has no lines; a quantity is 0 or less or a rate is negative (something taken out is an omission line, never a negative quantity); a line is worth 0; an omission does not name its Contract BoQ item, or names an item of another BoQ; a Contract BoQ rate was changed; more is omitted than is left; or a % line is missing.

ExampleVO-001: paving instead of landscaping (Architect's Instruction No. 4)
Omitted: Excavation 20 m3 at the contract rate 15,000(300,000)
Omitted: Provisional Sum for landscaping, by amount(10,000,000)
Total omissions(10,300,000)
Added: Concrete block paving 400 m2 at a star rate of 20,0008,000,000
Added: Extra concrete grade 25 in foundations 5 m3 at the contract rate 380,0001,900,000
Total additions9,900,000
Net value of the VO(400,000)
← PreviousVariation ordersNext →Approving a variation order

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • How each line is priced
  • Measured items, sums and % additions
  • What Submit checks