HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor firm

Bills of Quantities

  • Build a BoQ
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Take-off

Quick Measure

Type a few dimensions of a room, wall, foundation, slab, column or beam and get every quantity that follows, as dimension paper.

Not everything needs a drawing on the screen. Quick Measure takes the few dimensions a QS reads off a drawing or a site and writes every quantity that follows from them as rows of the measurement sheets, with the openings deducted, exactly as on dimension paper.

Steps

  1. 1On a BoQ in Draft or Tender press Quick Measure at the top; on a draft variation order, Quick Measure in its top bar.
  2. 2Choose the Template, type the Location / name (written on every row, e.g. Office 1, ground floor) and How many identical.
  3. 3Type the dimensions in metres, and the openings for a room or a wall.
  4. 4Press Calculate. Each quantity is listed with its unit, how it is Measured as, and the BoQ item HodariQ found for it.
  5. 5Untick any you do not want; choose or change Add to BoQ item, or leave it empty and choose New item in bill with a New item description.
  6. 6Press Add to the Measurement Sheets. Back returns to the dimensions.

The templates

TemplateYou typeIt gives
Room (floor, ceiling, walls, skirting)Length, width, height; doors and windowsFloor finish and ceiling L x W; wall plaster / paint 2(L+W) x H less openings; skirting 2(L+W) less door widths
Wall (walling and plaster)Length, height, plastered sides (0, 1 or 2); openingsWalling L x H less openings; plaster times the sides, less the openings on each side
Strip foundationCentre-line length, trench width and depth, blinding and footing thickness, wall thickness and heightExcavation, blinding, concrete in footing, foundation walling, backfilling, disposal of surplus
Floor slabLength, width, thicknessConcrete L x W x T; soffit formwork L x W; edge formwork 2(L+W) x T
ColumnsSection b and d, height of oneConcrete b x d x H; formwork 2(b+d) x H
BeamsSection b and d, length of oneConcrete L x b x d; formwork to sides and soffit L x (b+2d)

Openings start at 0.9 x 2.1 m for doors and 1.2 x 1.2 m for windows; type the number of each. How many identical multiplies every row.

ExampleTwo rooms 4.0 x 3.5 m, 3 m high, one door and two windows each
Floor and ceiling: 2 x 4 x 3.528.000 m2 each
Walls: 2 x 15 x 390.000 m2
Less doors: 2 x 1 x 0.9 x 2.1(3.780) m2
Less windows: 2 x 2 x 1.2 x 1.2(5.760) m2
Wall plaster / paint80.460 m2
Skirting: 2 x 15 less 2 x 0.928.200 m

The foundation

The excavation is the whole trench. What stays in the trench (blinding, footing and the walling below ground, up to the trench depth) is deducted from the backfilling and is the disposal, so backfilling plus disposal always equals the excavation.

ExampleA trench 40 m on the centre line, 0.6 wide, 1.0 deep; footing 0.2, blinding 0.05; 200 mm wall 1.0 high
Excavation: 40 x 0.6 x 1.024.000 m3
Blinding: 40 x 0.6 x 0.051.200 m3
Footing: 40 x 0.6 x 0.24.800 m3
Wall in the trench: 40 x 0.2 x 0.756.000 m3
Backfilling: 24 less 1212.000 m3
Disposal12.000 m3

Where the rows go

  • The BoQ item for each quantity is found by its unit and its key words, all of which must be in the item's description (floor; ceiling; plaster; skirting; concrete and slab; backfill...). Check every one.
  • The rows are added after the item's own rows; an item that had a quantity typed and no rows keeps it as Quantity before measuring.
  • With no item chosen, a new item is made in the bill shown; in a variation order, a new addition at a new rate, to price.
  • The blinding and footing together cannot be deeper than the trench: HodariQ says so.

Good to know

Quick Measure writes rows once: it keeps no link to the dimensions typed. To change them, edit the rows on the measurement sheet, or delete them and measure again. For a link that follows changes, measure on the drawing. Quick Measure is in the Professional and Enterprise plans.

← PreviousQueries to the architectNext →Tender analysis

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • Steps
  • The templates
  • The foundation
  • Where the rows go