HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor firm

Bills of Quantities

  • Build a BoQ
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Variations

VO from revised quantities

Remeasured quantities compared item by item with the contract, turned into a draft VO at contract rates.

When the works are remeasured from revised drawings (in HodariQ, in Excel or in another measuring program), the new quantities do not have to be typed into a VO line by line. HodariQ compares each item with the quantity the contract has today and makes the omissions and additions for you, at contract rates.

Steps

  1. 1Open the contract's Details and press VO from Revised Quantities (running contracts, on plans with remeasurement).
  2. 2Under Revised quantities from choose Excel file (from Excel, CostX...) and pick the file (.xlsx or .xls, up to 15 MB), or Another BoQ of the contract and pick the remeasured BoQ (not the Contract BoQ itself).
  3. 3Check the VO title (Remeasurement from revised drawings by default) and type the Instruction, for example Architect's Instruction No. 7 with drawings Rev C.
  4. 4Choose what happens to Contract items not in the revised quantities: Leave them as they are when only part of the work was remeasured, or Omit them when the whole work was remeasured and they are no longer needed.
  5. 5Press Find the Changes. A summary says how many items were read, how many were found in the Contract BoQ, how many are unchanged and how many are new.
  6. 6Check the list. Untick Put in the VO on any line to leave it out; a star rate's description and rate can be changed. Back returns to the first step.
  7. 7Press Create Variation Order: a draft VO opens with the lines, ready to check, submit and approve as usual.

How the comparison works

Only measured items are remeasured: items, preliminaries and dayworks. Provisional sums, PC sums, contingencies and % additions are left alone; change them with their own VO lines if needed. In an Excel file, sheets named summary, collection, cover or contents are skipped, and each other sheet is read when it has column titles for Description and Quantity.

  • Each revised row is matched to a Contract BoQ item by its reference (also written as bill/reference), or by its bill number and description. When a reference points to a different item than the description, the description wins: references are often renumbered in a revised BoQ.
  • The quantity in the contract today = the quantity let + approved additions of that item - approved omissions of that item.
  • Change = revised quantity - quantity in the contract today, to three decimals. More is an addition at the contract rate; less is an omission at the contract rate; no change, no line.
  • A row the Contract BoQ does not have, with a quantity, becomes a new item priced at the rate in the file (a star rate, to be agreed), or with no rate when the file has none.
  • A row matching an item already read is read once only; the duplicates are listed in the summary.

The screen shows for each line Qty in the contract, Revised qty, VO quantity, Rate and Amount, with Additions, Omissions and Net value at the top, and a Note where something needs a look:

NoteWhat it means
The revised rate is ignored: the contract rate standsThe file has another rate for an existing item. Remeasurement never changes a contract rate.
Also changes this item and is not approved yetAnother VO, still open, changes the same item. Approve or drop one of them first, or the item may be changed twice.
Only part of the quantity let is left to omitThe omission is larger than what is left of the quantity let; the rest was added by an earlier VO and must be omitted by hand from that addition.
New item: agree this star rate / New item without a rate: price itA new item, priced from the file or not priced at all. A line worth 0 is refused at Submit.
ExampleBlockwork remeasured from Rev C
Item 2/B4 in the contract today: 410 m2 let + 30 m2 from VO-002440 m2
Revised quantity395 m2
Omission: 45 m2 at the contract rate 42,000(1,890,000)
New item: blockwork screen wall 20 m2 at 48,000 from the file960,000
Net value of the draft VO(930,000)

A revised drawing in the take-off makes a VO the same way with Variation Order from Changes (see Take-off › Revised drawings).

Good to know

The draft VO is checked like any other at Submit: contract rates kept, nothing omitted twice, every line priced.

← PreviousApproving a variation orderNext →The VO document and the register

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • Steps
  • How the comparison works