Queries to the architect
Cloud a place on the drawing, write the question, record the answer and print the query list.
Questions about a drawing are best asked on the drawing. A query is a numbered cloud round the place in question with the question beside it; the answer is kept with it, and the list prints for the architect.
Raise a query
- 1Press the question-mark icon (Query) at the right of the tools.
- 2Click two opposite corners round the place in question. The cloud is drawn.
- 3Type the question, e.g. Size of the lintel over W05?, and press Enter.
It is numbered Q1, Q2... on the drawing and opens in the queries panel. The speech-bubbles icon opens the panel at any time; its badge is the number still open.
Answer it
- 1In the panel, find the query (p.2 shows it on the drawing).
- 2Type the Answer and Answered by (e.g. Architect, letter ref. 12). The Question can still be reworded while it is open.
- 3Press Mark answered. It needs an answer; the date is kept.
Reopen opens an answered query again. An open query can be deleted with the bin; an answered one is kept for the record and cannot be. Each query shows who raised it and when, and when it was answered. The Queries tab of the drawing's form lists them too, with Answered and Reopen.
The query list
Query List at the foot of the panel (or on the drawing's form) prints every query: No., Page, Question, Answer and Status. The marked drawing (Print) draws each one as a numbered cloud, so the architect sees where each question is.
Rules
- Queries are letters, not quantities: they can be raised and answered even when the BoQ is locked and the take-off is read only.
- On a revision every query is carried to the same place with the same number, its answer and its dates. Numbers go on from the revisions before, so Q4 stays Q4 for good.
- When the revision changed the drawing inside a cloud, the query says: The revision changed the drawing here: does it answer the query?
- A drawing replaced by a revision takes no new queries: they are on the revision.
Zones and heights