HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor firm

Bills of Quantities

  • Build a BoQ
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Take-off

Start a take-off

Upload a PDF drawing, choose the BoQ or variation order it measures into, and open it ready to measure.

The take-off measures quantities on the architect's and engineer's PDF drawings, on the screen, and puts each measurement on the measurement sheet of a BoQ item. Nothing is retyped: the item's quantity is the total of its sheet, and every row on the sheet says which drawing, which page and which measurement it came from.

Which drawings work

HodariQ reads the drawing itself, not a picture of it. What it can do depends on how the PDF was made:

The PDFWhat HodariQ can do with it
Exported from CAD (AutoCAD, ArchiCAD, Revit and the like)Everything: the scale is read from the drawing and checked against its dimensions, Snap lands on the drawn lines, Room and All Rooms find rooms, Doors & Windows reads the door and window marks, Same Symbols counts symbols, Dimension reads a written dimension, Check Dimensions adds up chains of dimensions, and a revised drawing can be compared line by line.
Scanned from paper (a picture inside a PDF)Clicking only: set the scale by hand with Scale, then measure with Length, Area and Count. There are no lines or words to read, so no snapping, no rooms, no marks, no symbols and no dimension checks. A scanned revision cannot be compared with the drawing it replaces.
Not a PDF (DWG, JPG, a photo)Refused: print or export it to PDF first.

Tip

Ask the architect for PDFs exported straight from CAD, not printed and scanned. It is the difference between clicking every corner yourself and clicking once inside a room.

Start a drawing

  1. 1Go to Estimating › Drawings & Take-off and press New. The New drawing window opens.
  2. 2Drop the PDF on the box, or click browse and choose it. Replace changes the file; the bin removes it.
  3. 3Check Drawing, the name: it is taken from the file name (underscores and hyphens become spaces), e.g. A-101 Ground floor plan.
  4. 4Choose the Contract. Only contracts that are not closed are listed; the contract of your last drawing is chosen first.
  5. 5Under Measure into choose Bill of Quantities or Variation order, then which one. Only BoQs in Draft or Tender, and variation orders in Draft, are listed.
  6. 6Press Start take-off (or Enter). The drawing opens at its first page, and HodariQ reads its scale at once.

When the contract is running and you choose Bill of Quantities, the window reminds you: The contract is running: quantities usually go to a draft variation order. A contract with neither a BoQ being prepared nor a draft variation order cannot be measured into: create one first.

From a BoQ or a variation order

On a BoQ in Draft or Tender, the Measure from Drawing button at the top of the BoQ opens the same window with the contract and the BoQ already chosen. A draft variation order has the same button in its top bar. Only the PDF and its name are left to give.

Opening a drawing again

  • Estimating › Drawings & Take-off lists every drawing with its revision, contract, BoQ and number of measurements. A click opens it straight in the take-off.
  • On a contract, the Drawings button lists that contract's drawings only.
  • In the take-off, the arrow at the top left goes back to where you came from. The drawing's name, or Details, opens its form: the revision, the zone of new measurements, the notes, and the tabs Measurements, Queries, Scales and Notes. Open Take-off goes back to the drawing.

What is kept with a drawing

KeptHow
The PDFAs uploaded, never changed. A revision is a new drawing linked to this one.
One scale per pageThe two points of a known length and its real length in metres.
Each measurementThe points you clicked, in the drawing's own units (so the zoom never matters), with its description, times, height, deduct, zone, pitch, assembly and BoQ item.
Queries, zones, heightsQueries belong to the drawing; zones and heights belong to the contract, so every drawing of the contract shares them.

Every length, area and count is worked out by HodariQ from the stored points, never by your browser, so the screen, the prints and the measurement sheets always show the same figure.

Good to know

The take-off is in the Professional and Enterprise plans. The administrator switches it on in Configuration › Settings › All settings, under Features: Drawings and Take-off. The Measure from Drawing buttons are shown to QS staff.

← PreviousCompare revisionsNext →The screen, keyboard and tablet

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • Which drawings work
  • Start a drawing
  • From a BoQ or a variation order
  • Opening a drawing again
  • What is kept with a drawing