Daily reports at the office
The site's diary: evidence for variation orders, extensions of time and certificates, and an alert for a day without one.
Go to Site › Daily Reports. The reports come as a list, or as cards with the first photo of each day. The contract workspace's Site tab shows the reports and material requests of one contract together, newest first.
Find a report
- Columns: Date, Contract, By, Weather, Hours lost, People, Photos and Work done.
- Filters: Rain (Rain and Heavy rain), With problems, With instructions, and Date. Group by Contract or Week.
- Search by contract, by person or by words in the work done, for example slab.
The report opens with everything the site sent: the people by trade with their total, the plant, the work done, the problems, the visitors and instructions, and the photos. The office reads it but cannot change it: it stays the site's own record. Use its conversation (Send message) to ask a question; the author sees the answer in the report's chat on the phone.
Make a variation order
An instruction written on site is often the first record of a variation. On the report press Make a variation order.
- The New variation order window opens for the contract, filled in from the report: the Title is the first line of Visitors and instructions (or, when empty, of the problems, then of the work done), the Instruction reads Site report and its date, and Date instructed is the report's date.
- Complete the items and save as for any variation order. The report then lists the variation order made from it.
- It needs a QS Officer or above, and a contract that is running or at practical completion.
Use for an extension of time
Press Use for an extension of time on the report. A new extension of time opens for the contract with:
- Reason: Exceptional weather when the report says Rain or Heavy rain, else Other. Change it if the delay had another cause.
- Details: the problems and delays written on site, or the work done when there were none.
- Days Requested: 1, to change.
- Site evidence: this report, with its date, author, weather, hours lost and problems.
The report then lists the extension of time it supports, and the extension of time keeps the report as its evidence.
Tip
Before a weather claim, filter Rain and group by Week: the reports and their hours lost are the evidence, day by day.
Site photos on a certificate
A certificate shows Site photos when there are reports in its period. It opens their cards, with the photos, titled Site photos and the certificate's name.
- The period: after the date of the contract's previous certificate (not counting the advance payment certificate), up to the date of this one. The first certificate takes every report up to its date.
- Useful when checking the work claimed, and when the employer asks what was done in the month.
A day without a report
The Daily site report setting (in the Site Portal settings) sets the days a report is expected: Monday to Saturday unless changed. Every hour HodariQ looks at the last expected day before today. On a Monday with Monday to Saturday that is Saturday; with Monday to Friday it is Friday.
- A contract is checked when it is running or at practical completion, has at least one active site person, and its possession date is not after that day.
- One report from anyone on its site team is enough for the day.
- Otherwise the Senior QS / Managers get the alert No site report for that day, with the contract, marked Soon, and the message that nobody on the site team sent the daily report, with the names to ask.
- The alert closes itself when the report for that day arrives, or when the next expected day is checked.
- Not required stops these alerts for the whole firm.
Good to know
The site can send a report for today or yesterday only. A forgotten Saturday cannot be sent on Monday: the day stays empty in the diary.
Something unclear? Ask us on WhatsApp: we answer the same day.