HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor firm

Bills of Quantities

  • Build a BoQ
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Bills of Quantities

Tender, lock and revise

The life of a BoQ: Draft, Tender, Contract BoQ and Superseded, who may press each button, and what a lock freezes.

A BoQ moves through four statuses. Each move is made only by its button on Details: an import, a script or a direct change cannot move a BoQ on, so the checks below always apply.

StatusWhat it meansCan be changed
DraftBeing prepared.Everything.
TenderIssued to tenderers.Everything: corrections during the tender period are allowed.
Contract BoQLocked: the priced BoQ the contract is signed on. Its total is the contract sum.Nothing but the costing link. Changes are variation orders.
SupersededAn older revision, replaced by a newer one.Nothing. Kept as it was, for the record.

The buttons

ButtonWhenWhoWhat it does
Issue for TenderDraftQS staffMoves it to Tender.
Back to DraftTenderQS staffMoves it back to Draft. Approvals already given are cleared.
Lock as Contract BoQDraft or TenderThe approvers set in Configuration › Settings › Approvals under Lock the Contract BoQ; nobody set: any Senior QS / Manager. The administrator always can.Checks the BoQ, records the approval and locks it.
UnlockContract BoQ, contract still a draftSenior QS / ManagerBack to Tender. Approvals are cleared.
New RevisionDraft or TenderQS staffCopies it into the next revision; this one becomes Superseded.

What locking checks

  • The BoQ has a total: a BoQ with no priced line is refused.
  • Every line that has a quantity has a rate. Otherwise HodariQ lists the unpriced lines (up to 15) by reference.
  • Every % addition has its % and the line it is added to.
  • The contract has no other Contract BoQ: a contract has exactly one.
  • You are an approver. If not, the message names who can lock it. While it waits, Details shows Waiting for approval and the Approvals tab lists what was given.

After the lock

  • The total excluding VAT becomes the contract's original contract sum; approved variation orders are added to it for the revised contract sum.
  • The contract can be started only once it has a Contract BoQ (with its contractor and dates).
  • Bills, lines, quantities, rates, measurement sheets, the name, date and notes are frozen. The BoQ opens read only in the editor and cannot be deleted. Import, paste, copy, Quick Measure and take-off into it are no longer offered.
  • The only thing that may still be set is the build-up used for costing on each item (Link to Build-ups), because it changes no figure of the BoQ.
  • Unlock is refused once the contract has started: from then on every change is a variation order.

Revisions

  1. 1On a Draft or Tender BoQ press New Revision and confirm.
  2. 2HodariQ copies every bill and line, with their % links and measurement sheets, into Rev A (then Rev B, Rev C...). The new revision keeps the status of the old one and shows Revision of with the BoQ it replaces.
  3. 3The old BoQ becomes Superseded and read only. It can still be printed and compared.
  • Only the newest revision can be revised: a BoQ that already has a newer revision is refused.
  • Approvals are not copied: the new revision is locked on its own approval.
  • Awarding a tender also makes a new revision, holding the winner's rates (see Tenders › Award and the tender report).
  • Compare Revisions shows what changed between a revision and the one before it (see Compare revisions).

Good to know

Something cannot be done yet? Getting started › What must come first lists every such message and what to do.

← PreviousExport to ExcelNext →Compare revisions

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • The buttons
  • What locking checks
  • After the lock
  • Revisions