HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor firm

Bills of Quantities

  • Build a BoQ
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Take-off

Lengths, areas and counts

Measure by clicking, how each quantity is worked out, and the settings that turn a length into m2 and an area into m3.

Three tools do most of the take-off: Length, Area and Count. A fourth, Dimension, takes a length straight off a dimension written on the drawing.

ToolHowGivesFor
LengthClick along the line, then Enter. At least 2 points.mWalls, skirting, DPC, drains, kerbs
AreaClick the corners in order round the shape, then Enter. At least 3 points; the last corner joins the first by itself.m2Slabs, floors, roofs, paving
CountClick each one once, then Enter.No.Sockets, columns, fittings, trees
DimensionClick on a dimension figure written on the drawing.mA length taken off its dimension line

Before pressing Enter, type the description in the box on the bar (it starts as Length, Area or Count); it can be changed later in the table. Undo point (Backspace) takes the last click back.

Clicking accurately

  • Snap (on by default, at the foot of the drawing): a click within 8 screen pixels of the end of a drawn line lands exactly on it, marked by a small square. It works on CAD drawings, not on scans.
  • Shift, or Straight on a tablet: each point goes straight across or straight down from the one before.
  • Zoom in: at 100% one screen pixel is one drawing unit, 35 mm on site at 1:100; at 400% it is about 9 mm.

How the quantities are worked out

  • A length is the sum of its straight pieces. A curve is measured as several short straight pieces along it: the more points, the closer to the true curve.
  • An area is worked out from its corners in the order clicked (the surveyor's shoelace method). It works for any shape with straight sides, an L or a T, as long as its sides do not cross each other.
  • A count is the number of clicks.
ExampleAn L-shaped room, clicked at its six corners
The whole rectangle6.000 x 4.000 = 24.000 m2
The corner cut out2.000 x 2.000 = 4.000 m2
Area measured20.000 m2

The table of measurements

Each measurement is a row, like dimension paper: its number and colour, the description, × (times), the quantity with its unit, and its BoQ item. p.1 shows it on the drawing; the chevron opens its settings; the bin deletes it (and its rows on the measurement sheets).

Under the description HodariQ shows how the quantity was made, e.g. = 25.2 x 3 x 3, and the figure on plan when a pitch or a centre line changed it.

The settings

SettingWhat it does
× (times)How many times it is built: typical floors, identical rooms, houses of one type. Above zero; up to 2 decimals.
x Height / depthA length times a height gives m2 (a wall); an area times a depth gives m3 (a slab, an excavation).
Height from sectionA height measured on a section instead of typed (see Heights from sections). Shown once the contract has heights.
ZoneThe floor, block or house it belongs to.
DeductTaken off its BoQ item: an opening, a void.
Roof pitch, centre line of wallsThe true length or area up a slope, and walls moved to their centre line (see Roofs and wall centre lines).
+ Assembly: add its items...One measurement filling several BoQ items (see Assemblies).

The quantity is the measured figure x height (when given) x times, rounded to 3 decimals: the same rule as the measurement sheet.

ExampleA wall 25.2 m long, 3 m high, on 3 typical floors
Length measured25.200 m
x height 375.600 m2
x times 3226.800 m2

Deductions

A measurement ticked Deduct keeps its positive figure in the table, marked Deduct, and is taken off when it reaches the BoQ: its row on the measurement sheet is negative, and the dimension sheets list it under the deductions.

ExampleA floor with a stair void
Floor, Area50.000 m2
Void 2.0 x 1.5, Area ticked Deduct(3.000) m2
BoQ item47.000 m2

Dimension

With Dimension on, click a figure written over a dimension line (e.g. 3,660). Its dimension line becomes a length named Dimension 3,660, and HodariQ compares it with the figure: within 1% it says as written; otherwise it warns that the line measures another length at this scale. It is a quick test of the scale and of the drawing. Press Done (Esc) to stop.

Good to know

Length, Area and Dimension need the page's scale; Count does not. A counted door or window has Width (m) and Height (m) instead of a height: its size, used for the deductions from the walls.

← PreviousThe scaleNext →Rooms: one click or every room

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • Clicking accurately
  • How the quantities are worked out
  • The table of measurements
  • The settings
  • Deductions
  • Dimension