HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor firm

Bills of Quantities

  • Build a BoQ
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Take-off

Revision to a variation order

On a running contract a revised drawing leaves the Contract BoQ alone and becomes a variation order at contract rates.

The Contract BoQ is locked: its quantities change only by variation order. So when a drawing measured into the Contract BoQ is revised, HodariQ compares the quantities of the two revisions item by item, and makes the variation order of the difference.

Steps

  1. 1Upload the revision with New Revision (see Revised drawings). The card says the Contract BoQ is locked.
  2. 2Work through every measurement marked To check: Measure again, Again with Room or Keep as is.
  3. 3The card lists each BoQ item that changed: BoQ item, Was, Now and Change, more in green, less in red. No BoQ quantity has changed yet means none.
  4. 4Press Variation Order from Changes. The draft variation order opens.
  5. 5Check it, add anything that is not measured, and submit it as any other variation order.

How the changes are worked out

  • For each drawing HodariQ adds up the quantity of each BoQ item measured on it, deductions taken off.
  • Change = the revision's quantity less the old drawing's, rounded to 3 decimals. Items that did not change are left out.
  • More is an addition, less is an omission, of the difference, at the item's contract rate.
ExampleRev B against Rev A, with a contract rate of TZS 32,500 per m2
Block walling: Was412.300 m2
Now428.900 m2
Change+16.600 m2
Addition: 16.6 x TZS 32,500TZS 539,500

The variation order made

FieldFilled with
TitleRevised drawing A-101 Ground floor plan Rev B
ReasonDesign change
Instruction referenceA-101 Ground floor plan Rev B replacing A-101 Ground floor plan Rev A
LinesOne per changed item: addition or omission, its Contract BoQ item, description and unit, the change as quantity, the contract rate
HistoryThe list of items with Was, Now and Change, made from the take-off

Rules

  • Variation Order from Changes waits until nothing is left To check: HodariQ names the measurements still to check.
  • Measurements of this revision cannot be sent to the BoQ: Send is hidden. They go only into the variation order.
  • One variation order per revision. Once it is made, the card shows a link to it and the revision becomes read only; if that VO is rejected, the revision opens again and a new one can be made.
  • The contract must be running or practically complete. A locked BoQ on a contract not started is refused: start the contract first.
  • Each revision is compared with the one before it: Rev C gives the changes since Rev B, not since Rev A.

Good to know

Only measurements that have a BoQ item count. A measurement with no BoQ item on either revision changes nothing in the variation order: choose its item before making it.

← PreviousRevised drawingsNext →Queries to the architect

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • Steps
  • How the changes are worked out
  • The variation order made
  • Rules