HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor firm

Bills of Quantities

  • Build a BoQ
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Bills of Quantities

Units

BoQ units are labels as a QS writes them; how they are recognised and added.

Every priced line has a unit: m, m2, m3, kg, t, No, Item, LS, Sum, Hr, Day, Week, Month come ready. A unit in HodariQ is a label printed in the Unit column. Units never convert into one another: a line in m2 stays in m2, and HodariQ does not turn tonnes into kilograms or metres into square metres.

The unit list

  1. 1Go to Configuration › Units.
  2. 2Each unit has its Unit (as printed, e.g. m2), a Description (e.g. square metre) and an Active switch. Drag the handle to change the order in which they are offered.
  3. 3Switch Active off for a unit the firm no longer uses: it is no longer offered, but lines that use it keep it.

Everyone can see the list; a Senior QS / Manager can change it. Each unit name can exist only once.

Units typed on a line

In the editor, in a paste from Excel and in an Excel import, you type or bring the unit as it is written. HodariQ first turns the usual ways of writing it into one name, then looks for that name in the list, whatever the capitals. A unit not in the list yet is added at once, so a QS Officer can use a unit the firm needs without asking. In an import, the check screen warns New unit "..." will be added to the unit list before anything is added. A unit that was switched off is used again rather than made twice.

Written asRead as
m, lm, rm, m1, metre, meter, runm
m2, m², sqm, sq.m, sq mm2
m3, m³, cum, cu.m, cu mm3
kg, kgskg
t, ton, tons, tonne, tonnest
no, no., nr, nos, each, pcs, pcNo
itemItem
ls, l.s., l/s, lump sumLS
sumSum
hr, hrs, hour, hoursHr
day, daysDay
wk, wks, week, weeksWeek
month, monthsMonth

Anything else is kept as typed: Bags stays Bags, Sets stays Sets. The Rate Library uses the same list, so a price list item in Bag and a BoQ line in m3 can sit side by side.

Edge cases

  • A unit that is only a number (e.g. 12 in the unit column of an Excel file) is not a unit: it is left empty and the line is marked No unit.
  • A % addition has no unit of its own: the editor shows % and the print writes %.
  • Sections and headings have no unit.

Tip

Keep one way of writing each unit. Typing Nr on one bill and No on another is fine (both are No), but Bag and Bags are two units.