Units
BoQ units are labels as a QS writes them; how they are recognised and added.
Every priced line has a unit: m, m2, m3, kg, t, No, Item, LS, Sum, Hr, Day, Week, Month come ready. A unit in HodariQ is a label printed in the Unit column. Units never convert into one another: a line in m2 stays in m2, and HodariQ does not turn tonnes into kilograms or metres into square metres.
The unit list
- 1Go to Configuration › Units.
- 2Each unit has its Unit (as printed, e.g. m2), a Description (e.g. square metre) and an Active switch. Drag the handle to change the order in which they are offered.
- 3Switch Active off for a unit the firm no longer uses: it is no longer offered, but lines that use it keep it.
Everyone can see the list; a Senior QS / Manager can change it. Each unit name can exist only once.
Units typed on a line
In the editor, in a paste from Excel and in an Excel import, you type or bring the unit as it is written. HodariQ first turns the usual ways of writing it into one name, then looks for that name in the list, whatever the capitals. A unit not in the list yet is added at once, so a QS Officer can use a unit the firm needs without asking. In an import, the check screen warns New unit "..." will be added to the unit list before anything is added. A unit that was switched off is used again rather than made twice.
| Written as | Read as |
|---|---|
| m, lm, rm, m1, metre, meter, run | m |
| m2, m², sqm, sq.m, sq m | m2 |
| m3, m³, cum, cu.m, cu m | m3 |
| kg, kgs | kg |
| t, ton, tons, tonne, tonnes | t |
| no, no., nr, nos, each, pcs, pc | No |
| item | Item |
| ls, l.s., l/s, lump sum | LS |
| sum | Sum |
| hr, hrs, hour, hours | Hr |
| day, days | Day |
| wk, wks, week, weeks | Week |
| month, months | Month |
Anything else is kept as typed: Bags stays Bags, Sets stays Sets. The Rate Library uses the same list, so a price list item in Bag and a BoQ line in m3 can sit side by side.
Edge cases
- A unit that is only a number (e.g. 12 in the unit column of an Excel file) is not a unit: it is left empty and the line is marked No unit.
- A % addition has no unit of its own: the editor shows % and the print writes %.
- Sections and headings have no unit.
Tip
Keep one way of writing each unit. Typing Nr on one bill and No on another is fine (both are No), but Bag and Bags are two units.