Material requests at the office
Approve, reduce or reject what the site asks for; delivered materials go into the costs by themselves.
Go to Site › Material Requests. The list opens on Waiting, so the requests that need a decision come first. Each approver also gets a to-do and an alert for each request (see Who approves).
The list
- Columns: Request (MR/2026/001 and on, one series a year), Requested on, Contract, Requested by, Items, Needed by, Amount with its total, and Status.
- Filters: Waiting, Approved, not yet received, Received, Rejected. Group by Contract or Status.
- Rejected and received requests are greyed. The contract workspace's Site tab lists the same requests for one contract.
The life of a request
| Status | How it gets there | What can still change at the office |
|---|---|---|
| Waiting | The site taps Send request. | Approved quantity, rate, cost head. |
| Second approval | Approved once, and the amount is at or over the large-request amount. | Approved quantity, rate, cost head. |
| Approved | Approved (and second-approved when needed). | Nothing on the items: the site now confirms the delivery. |
| Rejected | Rejected with a reason. | Nothing. It is final. |
| Received | The site taps Confirm delivery. | The rate, so the cost can be made. |
Approve as asked, or reduce
- 1Open the request. The items show Requested, Approved (the same as requested to begin with), Rate and Amount.
- 2Check the Rate. It comes from the price list; an item typed on site that is not in the price list has no rate. Type the price you will pay, before VAT. Optional: show the Cost head column and change it (Material, Plant or Other costs). An item of the price list of type plant starts as Plant, everything else as Material.
- 3Press Approve. A window opens with every item: Requested, Approved and Rate, and the Amount approved below them.
- 4To give less, type the lower figure under Approved: the Amount approved follows at once. Type 0 to refuse one item and keep the rest.
- 5Optional: write a Message to the site, for example Only 150 bags this week, the rest next week.
- 6Press Approve in the window. The site sees Approved or Approved, changed at once, with a message listing every change, and your message under it. Cancel closes the window and changes nothing.
At least one item must keep an approved quantity above 0, otherwise HodariQ asks you to approve one item or reject the request. The Amount of a request is the approved quantities at the rates; after the delivery it is the received quantities at the rates.
Reject
Type the reason in Why rejected, then press Reject. Without a reason HodariQ refuses: the site sees it. The reason is shown at the top of the request on the phone and sent to the site in the request's chat.
Into the costs
When the site taps Confirm delivery, HodariQ writes the cost for you. It counts what arrived (not what was asked or approved), at the Rate on the request, and adds it to the contract's costs, against its budget in Cost Control. The cost is dated the day of the delivery.
The cost line reads 150 bag Cement 50 kg, 6 m3 River sand. Items on different cost heads make one line per head:
- Where to see it: Money › Costs & Subcontracts › Costs, and the contract's Cost Control tab. The request itself lists its costs at the bottom and notes that it was put into the costs.
- The formula: for each cost head, the sum of received quantity x rate of its items. Items received as 0, or with no rate, are left out.
- Items without a rate: when none of the items had a rate, nothing is costed and the request shows Put in costs. Type the rates (they can still be changed on a received request) and press it. When some items had a rate and others not, only those are costed and the button no longer shows: enter the rest by hand in Costs.
- Who presses Put in costs: a Senior QS / Manager or Accounts. A request goes into the costs once only.
- It needs Cost Control switched on (contractor firms). Without it, deliveries are recorded but nothing is costed by itself.
Prefer to enter costs from the supplier's bill? In the Site Portal settings untick Delivered materials become costs. A received request then waits for someone to press Put in costs, or is left out, so nothing is counted twice.
Good to know
Nothing else changes by itself: the BoQ, variation orders and certificates are never touched from site. A delivery only becomes a cost.
Good to know
Rates and amounts are seen at the office only: on the request by anyone who can open it, and the cost lines by Senior QS / Managers, Accounts and Directors. The site never sees a price.
Order it on an LPO
Contractor firms with Cost Control: an approved request has Make LPO. Pick the supplier and the items to order from them; the LPO is approved and sent like any other (see Money › LPOs). Items on an LPO are costed by the LPO when the site confirms the delivery, at the LPO price; the other items as described above. LPOs on the request opens its LPOs, and the site sees on the phone who it was ordered from and when it is expected.