The contract workspace
One screen per contract: its figures, what is left to do, the next step and every document by tab.
Click a contract in Contracts › Contracts and its workspace opens (the dashboard and the BoQ and certificate screens lead back to it too). It is built for the daily work: the figures at the top, the one button that moves the contract on, and every document of the contract by tab. The full form with every field is one click away under Details.
The top bar
- The employer and the contractor, the contract number with its state, and the title. The arrow on the left goes back to all contracts.
- Details opens the contract's full form (parties, Key Dates, Commercial Terms, Cost Control, Notes).
- Statement prints the financial statement of the contract (see Money › Financial statement).
- The main button of the moment, by state and role: Start Contract (draft, Senior QS / Manager), Practical Completion (running, Senior QS / Manager), Final Account (practically complete, QS Officer and above), Close Contract (once the Final Certificate is certified, Senior QS / Manager), and Next valuation while the contract runs and has no Final Certificate.
The figures
| Box | Shows | Worked out as |
|---|---|---|
| Revised contract sum | With the original sum under it | Contract BoQ total plus approved variation orders |
| Certified to date | With % of the work and a bar | Gross of the last certified certificate; the % is the work done (materials on site left out) over the revised sum |
| Paid | With Still owed under it | Money received on certified certificates; still owed is what is not paid yet |
| Overdue | With the completion date | What is still owed on certificates past their due date (red when above 0) |
| Programme | N days left, or N days late | From today to the revised completion date (red when late) |
What is left to do
A draft contract shows Ready to start (the Contract BoQ locked, the contractor chosen, the dates filled). A practically complete contract shows Closing the contract (practical completion, the end of defects liability, the Final Certificate certified). Each step not done has its button: Open the BoQ, Fill in or Final Account.
The tabs
| Tab | Columns | Its button |
|---|---|---|
| Certificates | Certificate, Date, Status, Gross to date, Amount due, To be paid. Newest first; a click opens the certificate screen. | Next valuation |
| Variations | VO, Title, Instructed, Status, Net. | New variation order (running contracts) |
| BoQ | BoQ, Status, Lines, Total. A click opens the BoQ editor. | New BoQ (draft contracts) |
| Drawings | Drawing, Revision, Measures into, Measurements. Only the newest revision of each drawing. | New drawing |
| Payments | Certificate, Due, Status, To be paid, Paid, Still owed. Certified certificates only. | – |
| Bonds | Bond / policy, Type, Expires (red when expired), Amount. | – |
| Site | Material requests and daily reports from the site team. | Add site person |
Drawings shows with the Drawings and Take-off feature, Bonds with Bonds and Insurance, Site with the Site Portal; each is explained in its own topic. A tab with nothing in it says Nothing here yet.
Rules behind the buttons
- Next valuation never makes a second open certificate: if a draft interim certificate exists, it is opened again. A new one is dated today, or the date of the last valuation if that is later.
- A button is shown only to those who may press it, and is checked again when pressed: That cannot be done on this contract now means the state or your role changed in the meantime.
- Practical Completion asks for the date first (see Completion and closing).
The full form
Details shows the same contract with all its fields. Its Contract Summary lists the Contract BoQ, Original Contract Sum, Approved variations, Revised Contract Sum, VOs waiting for approval, Balance To Complete (or Over-certified by in red when the work certified passes the revised sum), Completion (revised), Days late, then Certified to date (gross), Of which materials on site, Work done to date, Work done %, Retention Held, Advance Outstanding, Liquidated damages deducted and the money figures. The buttons at its top right open the BoQs, Variations, Payment Certificates, Overdue certificates, Extensions, Invoices and Subcontracts of the contract.