HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor firm

Bills of Quantities

  • Build a BoQ
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Bills of Quantities

Compare revisions

Two versions of a BoQ side by side: items added, removed and changed, and what it costs.

When a BoQ is revised during design or the tender period, the client wants to know what moved and by how much. Compare Revisions lists every priced line that was added, removed or changed between two versions of a BoQ, with the old and new quantity, rate and amount.

Compare

  1. 1Open the newer revision's Details and press Compare Revisions. The button is there on a BoQ that is a revision of another.
  2. 2The window opens with Older version (the BoQ it replaced) and Newer version (this one) already compared. You can choose any other BoQ of the same contract as the older version.
  3. 3Read the totals: Older total, Newer total and the Difference, and the count of items added, removed and changed.
  4. 4Untick Show changes only and press Compare to see the unchanged lines too.
  5. 5Press Print for the BoQ Comparison report.

How lines are matched

  • A line with a reference is matched by its reference in the other version (2/A with 2/A).
  • A line without one is matched by its bill number and its description (spaces and capitals do not matter, the first 80 characters count).
  • Only priced lines are compared: sections and headings are not.
  • The same text twice in a bill (two profit lines, say) stays two lines.
StatusMeaning
AddedIn the newer version only (green).
RemovedIn the older version only (red).
ChangedIn both, with a different quantity, rate, percentage, description or unit; or the same of all of these but a different amount, as when the sum under a % addition changed (amber). What changed names it.
UnchangedShown only when Show changes only is unticked.
ExampleRev A against the first issue
2/A Excavate trenches: quantity 120 to 130 m3 at 15,000 (changed)+150,000
2/B Hardcore filling, 40.5 m3 x 45,000 (removed)-1,822,500
2/D Blinding concrete, 10 m3 x 300,000 (added)+3,000,000
Difference, newer less older+1,327,500

The difference of the window always equals the sum of the differences of its lines, so the report can be ticked line by line against the two totals.

Printed comparison

BoQ Comparison prints the contract, both versions with their totals, the difference with the counts, then one row per line: Status, Ref., Description, Unit, Old qty, Old rate, Old amount, New qty, New rate, New amount, Difference and What changed, with the Totals of the BoQs at the foot. With no difference it says No differences.

Good to know

Matching by reference means a line that was renumbered looks removed under its old reference and added under its new one. Press Renumber before issuing a version, not between two versions you will compare. A changed contract after the start is handled by variation orders, whose own register shows each change.

← PreviousTender, lock and reviseNext →Start a take-off

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • Compare
  • How lines are matched
  • Printed comparison