HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor firm

Bills of Quantities

  • Build a BoQ
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Take-off

Print the take-off

The marked drawing, the dimension sheets, the query list and the quantities by zone: what each shows and who it is for.

A take-off is only as good as its evidence. HodariQ prints four documents from it, for the checking QS, the architect and the site.

PrintFromShows
PrintThe take-off's top barThe drawing itself with every measurement drawn on it in its colour and number, and the queries as numbered clouds; then a list of the measurements.
Dimension SheetsThe top bar, or the drawing's formThe take-off as dimension paper, item by item.
Query ListThe queries panel, or the drawing's formThe questions to the architect and their answers.
Quantities by ZoneThe drawing's form, in PDF or ExcelEach BoQ item's quantity, zone by zone, over the whole contract.

The marked drawing

Print keeps the original pages and draws on them: lengths as lines, areas shaded, counts circled, each with its number, in the same colours as the screen. A last page lists them: No., Page, Description, Quantity, Times and BoQ item, with each page's scale. It answers the question every checker asks: where did this quantity come from?

Dimension sheets

Dimension Sheets writes the take-off on dimension paper, in four columns: Timesing, Dimensions, Squaring and Description. The measurements are grouped under their BoQ item in bill order; those not sent yet come last under Not sent to a BoQ item.

  • Timesing: the measurement's times (3/), and for an assembly item its formula's figure (2/ for plaster both sides).
  • Dimensions: a length, its height under it; a rectangle clicked at four corners as its two sides; any other area as the area itself (area off the drawing); a count as its number.
  • Squaring: the quantity; a deduction in brackets with Ddt before its description.
  • Description: the page, the zone, the description, and notes such as the formula, the opening size, the centre line or the pitch.
  • Under each item: Gross, Less deductions (when there are any), and Carried to the BoQ with the net quantity and unit.
ExampleOne BoQ item on the dimension sheets
Item headingBlock walling (m2)
3/ 25.200, 3.000226.800 p.1 External walls
2.000, 0.900, 2.100(3.780) Ddt p.1 D01 (door) 900 x 2100: Block walling (deduct opening) (N x W x H)
Gross226.800
Less deductions(3.780)
Carried to the BoQ223.020 m2

Query list and quantities by zone

The Query List has No., Page, Question, Answer and Status for each query, ready to send to the architect (see Queries to the architect). Quantities by Zone is explained under Zones.

Good to know

Print and Dimension Sheets appear once there is a measurement (Print also once there is a query). The take-off is printed as it is now: print again after a change.

← PreviousSend to the BoQNext →Check a take-off

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • The marked drawing
  • Dimension sheets
  • Query list and quantities by zone