Tender analysis
The tenders received for a BoQ, re-added, checked, ranked and awarded, from one screen.
A tender analysis holds the priced copies of one tender BoQ, one per tenderer. HodariQ prices every line of every tender again on your quantities, marks the arithmetic errors and the rates far from the others, ranks the tenderers on the corrected totals, and on award puts the winner's rates into a new revision of the BoQ, ready to lock as the Contract BoQ.
The flow
- 1Prepare the BoQ and press Issue for Tender on its Details. Send the unpriced PDF, or the Excel export for tender, to the tenderers (see Bills of Quantities › Print the BoQ and Export to Excel).
- 2When the tenders are opened, press Tender Analysis on the BoQ's Details. It opens the analysis of this BoQ, or a new one with the contract and the BoQ filled in.
- 3Press Read Tenders from Excel and choose every tenderer's priced BoQ at once, or add each tenderer on the Tenders tab and type the rates with Enter Rates.
- 4Type each tenderer's Tendered total, the sum written on the form of tender.
- 5Read the Tenders tab: the corrected totals, the arithmetic errors, the rates to check, the rank. Open Side by Side or the Comparison tab to see every line.
- 6Press Award on the chosen tenderer, then Open BoQ with Awarded Rates and lock it as the Contract BoQ.
- 7Press Print Tender Analysis for the tender report.
The analysis form
| Field | Meaning |
|---|---|
| Name | Tender analysis unless you change it. |
| Contract, Tender BoQ | The BoQ every tenderer prices: a Draft or Tender BoQ of the contract. When you choose the contract, its BoQ in Tender is proposed. Both are fixed once a tenderer is added. |
| Tenders opened on | Today unless changed. |
| Mark rates differing from the average by more than (%) | 25 to start. See Checks and ranking. |
| QS's estimate | The total of the tender BoQ as you priced it, or 0 if you did not price it. |
| Lowest corrected total | The lowest corrected total of the tenderers that priced at least one line. |
| Awarded to, BoQ with the awarded rates | Shown after the award. |
The Tenders tab lists one row per tenderer: # (rank), Tenderer, Tendered, Corrected, Difference, Errors, To check, Above lowest, then Enter Rates and Award. The Comparison tab shows every line with each tenderer's rate; Notes is free text for the report to the client.
What tenderers price
- Every measured item, preliminaries item, dayworks line and % addition of the tender BoQ, in bill order.
- Provisional Sums, Prime Cost Sums and Contingencies are fixed by the QS: each tender carries your sum unchanged, they are not tendered and never count as unpriced.
- A tenderer's % addition (profit on a PC Sum, say) is worked out on the sum as fixed by the QS.
Where to find it
- Estimating › Tender Analysis lists every analysis with its date, contract, BoQ, number of tenders, lowest total, winner and status (Open or Awarded). New starts one.
- On a contract's Details, the Tenders button opens its analyses.
- The Tender Analysis button is on a BoQ's Details for QS staff while the BoQ is not yet a Contract BoQ. On the awarded revision it opens the same analysis.
Good to know
Rates can be read and changed only while the analysis is Open. After the award, cancel it first (see Award and the tender report).
Good to know
Something cannot be done yet? Getting started › What must come first lists every such message and what to do.
Something unclear? Ask us on WhatsApp: we answer the same day.