HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor firm

Bills of Quantities

  • Build a BoQ
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Take-off

Doors, windows and symbols

Count door and window marks with their sizes and deduct their openings, and count every copy of a symbol at once.

Two tools count for you on a CAD drawing: Doors & Windows reads the marks written on the plan (D01, W05...), and Same Symbols finds every copy of a symbol you box once. Neither works on a scanned drawing, which has no words or lines to read: use Count there.

Doors & Windows

  1. 1Press Doors & Windows. The panel lists each mark of the page with its kind, how many there are (No.) and its Size (mm). Each mark counted is circled on the drawing.
  2. 2Check each size. When it is written beside the mark (as in a door schedule row: D01 900 x 2100) it is filled in; otherwise type it as width x height in millimetres, e.g. 900 x 2100.
  3. 3Press Add on each mark. It becomes a count named after it, e.g. D01 (door) 900 x 2100, with its width and height, and a tick replaces the button.
  4. 4Choose the BoQ items of the mark and of its deductions, then Send all.

How the marks are read

  • A mark is one to three capital letters and a number, with or without a hyphen or a space: D01, W-05, DW1, FD2A. The letters give its kind: D, DR, FD, SD, GD and DW a door; W and WD a window; V a vent; L a louvre; anything else other.
  • Paper sizes, bar marks and concrete grades (A1, Y12, C25 and the like) are never marks.
  • A mark with a size written after it on its line is a row of a schedule: it gives the size and is not counted, so the count is the doors on the plan. When every mark of a type has a size beside it, they are all counted.
  • A size is two figures of 3 or 4 digits with x between them, from 300 to 6000 mm each.

Openings deducted at once

When a mark is added with its size and the firm has an assembly for door and window openings (one is supplied: Door or window opening: deductions), its items are made under the count at once: the walling, plaster and paint the opening takes out of the walls, each ticked as a deduction and matched to its BoQ item.

ExampleTwo doors D01, 900 x 2100
Count2 No.
Block walling (deduct opening), N x W x H(3.780) m2
Plaster both sides (deduct opening), 2 x N x W x H(7.560) m2
Paint both sides (deduct opening), 2 x N x W x H(7.560) m2

Added without a size, a mark is a plain count with no deductions; type its Width (m) and Height (m) in its settings later and add the openings assembly by hand.

Same Symbols

  1. 1Press Same Symbols.
  2. 2Click two opposite corners of a box round one whole symbol (a socket, a WC pan, a light), and nothing else.
  3. 3Every copy on the page is outlined in green, turned or mirrored copies too. Click an outline to leave that one out (it goes grey); click again to take it back.
  4. 4Type the Description, e.g. 13 A twin sockets, and press Add as count. The button shows how many are ticked.

The lines wholly inside your box are the symbol. HodariQ tries each line of the page as long as the symbol's longest line, both ways round, plain and mirrored, and moves the symbol onto it: every one of its lines must then be found on the page, end to end. All of them, not most, so nothing is guessed.

  • A copy drawn at another size is a different symbol and is not found.
  • Copies with more lines inside them (a double socket holds a single one) are outlined in orange and not counted: if they are the same item, count them with Count.
  • When only the boxed copy is found, HodariQ asks: is the box round one whole symbol, and nothing else? A box with no whole line in it, with too many lines (a whole room), or too small, is refused with a message.

Tip

Box the symbol tightly. A wall line passing through the box does not matter (it is not wholly inside), but a stray tick or label inside the box becomes part of the symbol, and copies without it are not found.

← PreviousRoofs and wall centre linesNext →Assemblies

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • Doors & Windows
  • How the marks are read
  • Openings deducted at once
  • Same Symbols