Submitting, certifying and freezing
States, who certifies, the checks at each button, what is copied from the contract, and why a certified certificate never changes.
A certificate is a legal document: once certified it must read the same for ever, whatever happens to the contract later. HodariQ does this by copying the contract's terms onto each valuation and freezing them in steps.
The states
| State | Reached by | What can be changed |
|---|---|---|
| Draft | Next valuation, or Back to Draft | Everything: lines, materials, dates, release, waiver. Terms are copied again from the contract whenever they change. |
| Submitted | Submit | Nothing. Back to Draft (QS staff) reopens it; approvals given are cleared. |
| Sent to employer | Approve & Send to Employer (contractor firms certified by the employer's QS) | Only the lines and materials, to type the employer's figures, and their certificate number and date. |
| Certified | Certify, Certify & Print, Submit & Certify or Record Employer's Certificate | Only the notes. It cannot go back to draft or be deleted. |
Who presses what
- Prepare, Submit, Back to Draft and Excel Progress: QS staff.
- Certify: the people ticked in Settings › Approvals under Certify valuations; nobody ticked, any Senior QS / Manager. They get a to-do, and can also certify from the dashboard alerts.
- Submit & Certify replaces Submit for someone who may certify their own valuation. Certify & Print certifies and opens the PDF in the same click.
- A certificate valuing work above the revised contract sum, and Record Employer's Certificate: a Senior QS / Manager only.
What each button checks
Submit refuses a valuation dated before the previous certificate, and a Final Certificate with materials on site. It copies the contract terms and approved VOs one last time and checks the retention release (see Retention).
Certify refuses when: the previous certificate is not certified yet; the valuation date is in the future (work cannot be certified before it is valued); Certified on is before the valuation date or after today; an interim amount due is below the Minimum certificate amount; or the work valued is above the revised contract sum and Why above the contract is empty (for example remeasured on completion, VO-004 on its way). Several certificates certified together go in order, the advance payment certificate first.
Certified on is the date the certificate is signed; left empty, it is the day Certify is pressed. It is printed as the certificate date, and the payment period (Payment period (days), 28 by default) runs from it.
What is copied from the contract
The Contract Terms Used tab of Details shows the copy the certificate works with:
| Group | Terms copied |
|---|---|
| Contract sum | Original contract sum, approved variations, revised contract sum. |
| Retention | Retention %, retention limit (as an amount), retention on materials on site, released at practical completion (%). |
| Advance | Advance paid (advance payment certificates certified), advance recovered by, recovery %, recovered over. |
| Liquidated damages | The rate, per day or per week, the limit (as an amount), completion (revised), practical completion; and the setting for damages after VAT and WHT. |
| Tax and payment | VAT %, withholding tax %, minimum certificate amount, payment period (days). |
The copy is taken when the valuation is made, and taken again while it is a draft: whenever one of these terms or dates changes on the contract, when a VO is approved (its additions become lines), when an extension of time is granted or reopened, and at Submit. From Submit on it is frozen: these terms are changed only through the buttons, never by an edit, an import or a script.
Corrections
A certified certificate is never changed. A mistake is corrected in the next valuation: type the right quantity or % to date, and because every figure is to date, the next certificate's This period puts it right, up or down. A certificate that is only submitted goes Back to Draft instead. Only a draft can be deleted.
- Certificate numbers follow on, IPC No. 1, 2, 3, and are unique on the contract: two people pressing at the same moment never get the same number (the second is asked to press again).
- One certificate of a contract is open at a time; Next valuation reopens it.
- After the Final Certificate, no further certificate can be made, no VO approved and no extension of time granted.
Good to know
Editing the contract after a certificate is certified (a new retention %, a new VAT rate) changes only drafts and future valuations. Certified certificates keep the terms they were certified with.