HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor firm

Bills of Quantities

  • Build a BoQ
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Site Portal

Notifications on the phone

Install the site pages as an app, turn notifications on, and what rings: the office's messages, approvals and the daily report reminder.

A phone can ring when the office writes, even when HodariQ is closed: a message from the office, a request approved, changed or rejected, a message in the group chat, and a reminder late in the afternoon when today's report is not sent. Tapping the notification opens the chat it is about.

Put HodariQ on the home screen

The site pages work as an app: an icon on the home screen, opening full screen without the browser bar. Nothing is downloaded from a store and nothing to update: it is always the latest HodariQ.

PhoneHow
Android (Chrome)Open the site link, tap the three dots at the top right, then Add to Home screen (or Install app). Chrome may also offer it in a bar at the bottom.
iPhone (Safari)Open the site link in Safari, tap Share (the square with an arrow), then Add to Home Screen, then Add. Open HodariQ from that icon from then on.
Computer (Chrome or Edge)Optional: the install icon at the right of the address bar opens the site pages in their own window.

Turn notifications on

  1. 1Open HodariQ and sign in with the site login.
  2. 2On the home page, the card Turn on notifications shows at the top: tap Turn on. (Or tap the round picture at the top right, My account, then Turn on notifications.)
  3. 3The phone asks to allow notifications from HodariQ: tap Allow.
  4. 4My account now says On. This phone rings from now on.

Good to know

On iPhone, notifications only work from the home screen icon (iOS 16.4 or later): Apple does not allow them in a Safari tab. In Safari the card explains how to add HodariQ to the home screen first.

Tapped Not now on the card? It is not shown again on that phone; turn notifications on any time from My account. Tapped Block on the phone's question? My account says they are blocked: allow notifications for the HodariQ site in the browser's settings (Chrome: the lock left of the address, Permissions, Notifications), then come back.

What rings, and what opens

WhenThe notificationOpens
The office writes on a request (Send message)Who wrote it, the request number and the textThe request's chat
A request is approved, changed or rejectedApproved as requested, the changes item by item, or the reasonThe request's chat
The office writes on a daily reportWho wrote it and the textThe report's chat
Someone writes in the group chat of the contractWho wrote it, the contract and the textThe group chat
17:00 on a report day, no report yet todayDaily report not sent: the contract numberToday's daily report of that contract
  • Never: internal notes (Log note), status changes, prices or costs, and a person's own messages.
  • Already open: when the chat a message is about is open on the screen, the phone does not ring; the message shows in the chat.
  • Many messages on one chat: the newest replaces the last notification of that chat, so the phone does not fill up.
  • The reminder: sent at 17:00 (Dar es Salaam time) on the days set in the Daily site report setting (Site Portal block of the settings), to every phone of the contract's site team that has notifications on, only when nobody on the team has sent today's report. Not before the contract's possession date.

Turning them off, and lost phones

  • On the phone: My account › Turn off on this phone.
  • Signing out: Sign out turns notifications off for that phone first, so a shared phone does not get the next person's messages.
  • Login switched off: unticking Active on the person stops notifications to all their phones at once.
  • Lost or new phone: Send login at the office makes a new password and forgets every phone of that person. On the new phone, sign in and turn notifications on again.

The office

Office people get HodariQ's own notifications in the browser on their computer or phone: messages on the requests, reports and site chats they follow, such as a new material request or a question from site. The first time HodariQ asks in the browser to allow notifications; allow it. They show even when the HodariQ tab is in the background.

How it works

  • Web push: the standard of the browsers (Chrome, Edge, Firefox, Safari). The phone gives HodariQ an address at its browser's push service (Google for Chrome, Apple for Safari); HodariQ sends each notification there, encrypted, and the browser shows it. No SMS or WhatsApp fees: it is free.
  • Keys: each firm's database makes its own push keys the first time a phone turns notifications on. Nothing to set up per firm.
  • Needs a real web address with https (for example app.yourfirm.com with a valid certificate). Phones refuse notifications from an address without https, such as a bare IP address.
  • Delivery: usually within seconds. A phone that is off or without network gets it when it comes back, within a short time; after that the notification is dropped (the message itself is always in the chat).
  • One person, several phones: each phone with notifications on rings.
← PreviousChats and photosNext →Material requests at the office

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • Put HodariQ on the home screen
  • Turn notifications on
  • What rings, and what opens
  • Turning them off, and lost phones
  • The office
  • How it works