HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor firm

Bills of Quantities

  • Build a BoQ
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Contracts

Key dates and contract states

The Key Dates tab, the four states of a contract, what each one allows, and who moves it on.

A contract moves through four states: Draft, Running, Practically Complete and Closed. The state decides what can be made on it and who may change it. States change only through the buttons; a status typed into an import or changed in any other way is refused, because the buttons are where HodariQ checks who may and when.

The Key Dates tab

FieldWhat it holds
Tender Date, Contract DateThe contract date cannot be before the tender date.
Possession of siteThe start of the works. Until the first certificate, the valuation reminder counts from it.
Completion (contract)Must be after possession of site.
Contract period (weeks)Type the weeks and the completion date is worked out from possession of site; type both dates and the weeks are worked out (rounded).
Days granted (EOT) and Completion (revised)Shown once an extension of time is granted: the completion date plus the days granted. Liquidated damages and the reminders use the revised date.
Practical completion (actual)Filled when practical completion is recorded. Cannot be before possession of site.
Defects liability period (months)12 by default.
Defects liability endsPractical completion plus the defects liability months, worked out by HodariQ.
ExampleDates of contract HQ/2026/001
Possession of site05/01/2026
Completion (contract)28/12/2026 (51 weeks)
Extension of time granted21 days
Completion (revised)18/01/2027
Practical completion (actual)15/01/2027
Defects liability ends (12 months)15/01/2028

The four states

StateWhat can be doneWho moves it on
DraftPrepare everything: parties, dates, terms, BoQs (New BoQ on the workspace). No variation order or certificate yet. A QS Officer may edit it.Start Contract: Senior QS / Manager
RunningValuations (New Valuation, Next valuation), the advance payment certificate, variation orders, extensions of time, invoices, costs and subcontracts. Terms changed by a Senior QS / Manager only.Practical Completion: Senior QS / Manager
Practically CompleteThe same, plus Final Account. Retention release and the defects liability period run.Close Contract: Senior QS / Manager
ClosedThe contract is settled. Money still owed on its certificates is still followed up.Reopen only

Start the contract

A draft contract shows a Ready to start checklist on its workspace and its form: Contract BoQ locked, Contractor chosen and Contract date, possession and completion, each with a tick or a button (Open the BoQ, Fill in). Start Contract checks the same things and says what is missing, for example Fill in before starting the contract: Contractor, Possession of site. Without a locked Contract BoQ it says Lock a priced BoQ as the Contract BoQ first: the contract sum comes from it. The original contract sum is always the total of the Contract BoQ; the revised contract sum adds the approved variation orders.

Going back a step

Reopen (Senior QS / Manager) takes the contract back one state, for a status set by mistake:

  • Running to Draft only while the contract has no variation order and no certificate; otherwise HodariQ refuses it.
  • Practically Complete to Running clears the practical completion date, so liquidated damages run again.
  • Closed to Practically Complete.

Archive or delete

Only a draft contract can be deleted, by a Senior QS / Manager. A started contract is archived instead: it leaves the lists but keeps all its documents; the Archived filter shows it again. The Contracts list filters by Draft, Running, Practically Complete, Closed and Archived, and groups by Status, Employer or Region; its columns show the contract sum, the certified % and the state.

Good to know

Something cannot be done yet? Getting started › What must come first lists every such message and what to do.

← PreviousCommercial termsNext →The contract workspace

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • The Key Dates tab
  • The four states
  • Start the contract
  • Going back a step
  • Archive or delete