HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor firm

Bills of Quantities

  • Build a BoQ
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Money

Schedule of materials

The materials, labour and plant a BoQ needs, worked out from the rate build-ups, with what is bought and still to buy.

The schedule of materials, labour and plant turns a priced BoQ into what must be ordered and hired: 30 m3 of concrete priced from a build-up of 7 bags of cement a m3 needs 210 bags, plus the build-up's wastage. It needs the Rate Library feature, because the quantities come from the build-ups of the library rates.

Open it

  • On any BoQ, press Schedule of Materials (QS Officer and above).
  • On a running contract, press Schedule of Materials on the Cost Control tab: it opens the schedule of the Contract BoQ.

The window shows Measured work, With a build-up and Cost of these resources, then one line per resource: Type, Code, Resource, Unit, Net quantity, Wastage (optional), To order, Unit cost, Cost, and on a Contract BoQ with purchases Bought and Still to buy. Choose a Bill (empty: the whole BoQ) and what to Show (Everything, Material, Labour, Plant, Subcontract), then press Show. Print PDF and Excel give the same schedule, grouped by type.

How the quantities are worked out

  • Net quantity = BoQ quantity x the quantity a unit of the build-up line, summed over every item that uses the resource.
  • To order = net quantity plus the wastage % of each build-up line.
  • Cost = BoQ quantity x the build-up line's amount; Unit cost = cost / to order.
  • Which build-up: the one chosen on the line as Build-up for costing, else the library rate the line was priced from, when that rate has a build-up.
  • Which quantities: the BoQ's. On a Contract BoQ, approved variation orders count: omissions take quantity off the item, additions bring their own build-up (their library rate, or the build-up of the BoQ item they extend).
  • Only measured work (items, preliminaries, dayworks) is scheduled. PC and Provisional Sums and contingency are not the contractor's own resources and are left out.
  • Resources are listed materials first, then labour, plant and subcontract, by code.
ExampleConcrete grade 25, 30 m3: cement 7 bags a m3, 5% wastage, TZS 20,000 a bag
Net quantity: 30 x 7210 bags
Wastage 5%10.5 bags
To order220.5 bags
Cost: 220.5 x 20,0004,410,000
Bought (costs entered with this resource)300 bags
Still to buy (red: more bought than needed)-79.5 bags

Items without a build-up

When measured items have no build-up, a yellow note says how many, and that the schedule covers only part of the measured work (the % shown). Its Link Items to Build-ups button (also Link to Build-ups on the BoQ) opens a window that matches each such item with the library rate that fits it best:

  • The match compares the words of the description and the unit. Another unit never matches; different figures (grade 25 against grade 30, 150 mm against 200 mm) weigh against.
  • Each row shows the Library rate, its Match % and Match: Good (60% and over), Check, or None found (no rate under 35% is proposed).
  • Only a sure match (100%) is ticked for you. Tick Link on the others after a look, change a rate where needed, and press Link. Choosing a rate in another unit warns that the quantities would be wrong.

Linking changes no rate and no amount of the BoQ, so it is allowed on a locked Contract BoQ; it only tells the budget and the schedule which build-up to use. The BoQ's history notes how many items were linked.

Good to know

Unit costs and costs are shown only to users who see rate build-ups (Rate build-ups and margins, Senior QS / Manager, Accounts, Director). A QS Officer sees the quantities, and the print-outs leave the costs out for them.

← PreviousSuppliers and their pricesNext →Subcontracts

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • Open it
  • How the quantities are worked out
  • Items without a build-up