Features and switches
The features that come with each plan, where they are switched, and what switching one off hides and blocks.
Apart from the core, every feature of HodariQ is a switch in Configuration › Settings › All settings › Features. Only the administrator sees the switches. A feature that is on is on for every user of the firm; a feature that is off is hidden for everyone. Switching one off deletes nothing: what was entered stays and shows again when it is switched back on.
The features
| Feature | What it adds | Starter | Professional, Enterprise |
|---|---|---|---|
| Tender Analysis | Compare the tenderers' priced BoQs, rank them and award. | – | Yes |
| Quick Measure | Rooms, walls, foundations, slabs, columns and beams measured from a few dimensions. | – | Yes |
| VO from Revised Quantities | Remeasured quantities (Excel, CostX, PlanSwift or another BoQ) turned into a variation order. | – | Yes |
| Drawings and Take-off | Measure lengths, areas and counts by clicking on PDF drawings. | – | Yes |
| Bonds and Insurance | Register of bonds, guarantees and policies, with expiry reminders. | – | Yes |
| Documents Register | Licences, registrations and permits that expire, with reminders. | – | Yes |
| Advanced configuration | Price regions, trades and saved Excel layouts in the Configuration menu. | – | Yes |
| Cost Plans | Elemental estimates before there is a BoQ. | – | Yes |
| Contractor Portal | Consultant QS firm: the contractors send their claims online and see their certificates. | – | Yes |
| Site Portal | The site team requests materials and sends the daily report from their phones, never seeing a price. | – | Yes |
| Inbox and Work | The firm's e-mail becomes work: checked, given to someone with a deadline and a contract, replied to and done. | – | Yes |
| Cost Control and Subcontracts | Contractor firms: budget, costs, profit, subcontracts. | – | Yes |
| Rate Library | Rate build-ups and the price list, picked on BoQ and VO items. | – | Yes |
| Compare BoQ Revisions | Two versions of a BoQ side by side, with what changed and what it costs. | – | Yes |
| Approval Levels | Named approvers and the second approval of large variation orders. | – | Yes |
| Payment Follow-up | Overdue certificates listed and raised as alerts. | – | Yes |
| Measurement Sheets | The dimensions (times, no., length, width, height, deductions) behind each quantity, printed with the BoQ and the certificate. | – | Yes |
| Materials on Site | Unfixed materials paid on interim certificates, with the % allowed and retention on them. | – | Yes |
| Valuation Progress from Excel | Fill a valuation's progress from an Excel file instead of typing it. | – | Yes |
The Contractor Portal switch does not appear for a contractor firm. The menus of Cost Control and Subcontracts appear only in a contractor firm, even when the switch is on.
What happens when a feature is off
- Its menus, tabs, buttons and dashboard tiles disappear for everyone.
- Opening it another way, for example from an old link or a bookmark, is refused: "… is not switched on for your company. Ask your administrator."
- Records that belong only to it (documents, cost plans, costs, subcontracts) are hidden until it is back on.
- Settings that belong to it are hidden in All settings.
- Some features change a rule rather than a screen: without Approval Levels any Senior QS / Manager approves; without Payment Follow-up no overdue-payment alerts are raised; without Rate Library a variation item is priced as a star rate or from the Contract BoQ ("The rate library is not in your plan …"); without Materials on Site none can be added ("Materials on site are not in your plan.").
When the plan changes
When HodariQ applies a plan, its features are switched on and the others off, once. A switch the administrator changes afterwards stays as it is until the plan changes again. The effect is immediate: menus and rights follow at the next screen.
Tip
If a feature is in your plan but your firm does not use it (for example take-off), switch it off: the screens become simpler for everyone, and you can switch it back on any day.
Something unclear? Ask us on WhatsApp: we answer the same day.