Send to the BoQ
Put measurements on BoQ items, make a new item from the drawing, and what stays linked after sending.
A measurement counts in the BoQ once it is sent: it becomes a row of its BoQ item's measurement sheet, and the item's quantity is the total of the sheet. The link stays: change the measurement and the row follows.
Send
- 1On the measurement's row choose the item in BoQ item…. The list shows the measured items of the BoQ in bill order, with their units; in a variation order, its additions.
- 2Press Send. A Sent badge appears and the button becomes Update.
- 3With an assembly, choose the BoQ item of each item under the measurement, then press Send all: the measurement and every item that has its BoQ item go together.
What the row on the sheet holds
The row is named after the drawing, the page, the zone and the measurement, e.g. A-101 Ground floor plan, p.1 [Ground floor]: External walls. Its figures are written the way a QS writes dimension paper:
| Measurement | Times | No. | Length | Height | From drawing |
|---|---|---|---|---|---|
| A length | its × | 1 | the length | its height, if any | |
| An area | its × | 1 | its depth, if any | the area | |
| A count | its × | the number | |||
| An assembly item | the measurement's × | 1 | the formula's quantity |
Ticked Deduct, the row is negative. The take-off's rows come after any rows already on the sheet. An item that had a quantity typed before anything was sent keeps it as its first row, Quantity before measuring, so nothing typed is lost.
What stays linked
- Changing a sent measurement (its points, height, times, zone, pitch, deduct, the page's scale) changes its row at once. Update sends it again by hand; it never adds a second row.
- Choosing another BoQ item for a sent measurement moves its row to that item.
- Deleting a measurement deletes its row, and those of its assembly items.
- A measurement is sent to one item. To fill several items from one measurement, use an assembly.
Units must agree
A measurement gives m, m2, m3 or No. Sent to an item measured in another of those four units, HodariQ refuses, e.g. Wall gives m2 but 2/A is measured in m3. Give the measurement a height or depth, or choose the right item. Items in other units (kg, item, sum) are not checked: the figure goes as it is.
An item that is not in the BoQ yet
- 1In BoQ item… choose + New item… at the top of the list.
- 2Check Description (it starts as the measurement's) and Unit (the measurement's), and type a Rate (optional).
- 3Choose the Bill, or + New bill… with its Bill No. (the next number is offered) and Bill title.
- 4Press Add item: the item is made in the BoQ and chosen. Then press Send.
In a variation order the new item is an addition at a new rate, with a quantity of 1 until the measurement is sent and gives it its quantity.
When the BoQ is locked
Measurements go only to a BoQ in Draft or Tender, or a variation order in Draft. Once the BoQ becomes the Contract BoQ, or the VO is submitted, the take-off shows Read only: the BoQ or VO is locked, and the rows are locked with their document. Changes then come by a revised drawing and a variation order. Queries can still be raised.
Good to know
Without a scale a length or area cannot be sent (Set the scale of page 2 before sending its measurements); counts can.
Something unclear? Ask us on WhatsApp: we answer the same day.